My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-26-1990 Countil Packet
Orono
>
City Council
>
1990
>
03-26-1990 Countil Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2024 2:17:06 PM
Creation date
10/14/2024 2:15:38 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. Assessment FormulaThe total cost of Sanitary Sewer Project Mo. 73-1 including <br />construction costs and indirect costs is $1,622,118. Fron this <br />amount the above described truck cost, possible future assessment <br />revenue, possible future trunk revenue and assessod trunk revenue <br />are deducted. The remaining amount of $1,466,518 is assessed <br />as a lateral benefit. The lateral benefit is divided into 40% <br />placed against front footage and 60% placed against building <br />unit for purposes of providing equity in division of the costs <br />to various shaped lots. <br />a. Unit <br />A building unit is defined as the minimum allowable <br />width parcel containing adequate area to meet the requirements <br />of the zoning code for the district in which the property is <br />located, wiiere properties have sufficient width and area to <br />be subdivided they are assessed the whole number of maximum <br />units Into which the property can be subdivided if all such <br />subdivided lots have sewer contiguous to them. <br />Certain existing properties do not meet the minimum stan <br />dards for tlie lot dimensions in the zoned usu district in which <br />they exist. In those instances the properties are combined <br />into a logical pattern to yield a lot as near as possible to <br />the minimum standards for that use district. Each substandard <br />lot is the assessed a fractional unit based on the number of <br />lots required to make the larger lot. <br />b. Front Foo* • ^ <br />The front foot;«ge to be assessed is determined according <br />to the following guidelines: <br />a. On rectangular lots, the width of the lots is assessed. <br />b. On corner rectangular lots, the least dimension is con <br />sidered the wio ' of the lot. <br />c. On lots wich a varying width, the average width is <br />assessed. <br />d. On pie shaped or triangular parcels and on parcels <br />where no definite width can be determined, the width <br />assessed is calculated as the prorated minimum width <br />based on the lot area. <br />-3- <br />L
The URL can be used to link to this page
Your browser does not support the video tag.