My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-26-1990 Countil Packet
Orono
>
City Council
>
1990
>
03-26-1990 Countil Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2024 2:17:06 PM
Creation date
10/14/2024 2:15:38 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b. <br />■ <br />Oversizing of sewer connection between Daniels Long Lake Heights and existing Long Lake Lift Station.That oversizing was necessary to facilitate the extension of trunk sewer to an area which some day may be serviced if the trunk line is extended beyond its present point. Cost of $8,000.c.That amount which the City of Orono has determined cannot be assessed against certain properties because those properties cannot be subdivided to a lot <br />size which necessitates public sanitary sewer and <br />therefore said properties are not benefited by this <br />project and because the City will not allow <br />said properties to connect to the sanitary sewer <br />system, or the City will not construct the connection <br />lines necessary for a connection to be possible. <br />In the event that the City of Orono later allows <br />said properties to subdivide or to connect to the <br />sanitary sewer built in this project, the City of <br />Orono will reimburse itself for said amount through <br />connection charges or special assessment charges <br />against said properties pursuant to law. <br />The estimated maximum amount that assessing said <br />properties would have generated is $115,000. This <br />amount therefore is spread on the general tax levy. <br />/;?3 ^ - <br />2. Area Assessments <br />Certain properties within the benefited area of this project <br />have previously been assessed under earlier projects for the cost <br />of downstream trunk sewers into which the lateral sewers con <br />structed under this project connect. These previously assessed <br />properties were assessed on the basis of area and are not being <br />further assessed for trunk on an are; basis under this assessment. <br />Other properties within the benefited area, which were not pre <br />viously assessed for trunk, are being assessed under this assessment <br />on the basis of $250.00 per acre. This charge represents the <br />adjusted cost taking into account inflation since the time of <br />the installation of the original trunk sewers that services all <br />of those areas except the Daniel's Long Lake Heights Area. In <br />this case the $250.00 charge represents the amount assessed per <br />benefited acre for the cost of installation in this project of <br />the new trunk sewer necessary to serve this area. <br />-2-
The URL can be used to link to this page
Your browser does not support the video tag.