My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-26-1990 Countil Packet
Orono
>
City Council
>
1990
>
03-26-1990 Countil Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2024 2:17:06 PM
Creation date
10/14/2024 2:15:38 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. What are the costs of the project and what are anticipated to <br />be the financing options. <br />The cost*: =>.8 ,v2tailed on the sheet that was handed out, <br />split out between about a $6,500 assessment charge and <br />between $4,200 and $9,700 connection charge. It is <br />anticipated that it would be a 15 to 20 year bond issue. If <br />your total assessment plus connection charge was $10,000 <br />over 15 years that would cost about $670 per year in interest, <br />together with an initial interest cost of about $800 which <br />would be decrease over the 15 year period to a final year <br />interest cost in the range of $60,00. .spread “ver__years, <br />the annual principal would go down Dc': the amount of interest <br />paid over that tiraeperiod would be increased. If your rate <br />is $15,000 just multiply those numbers by 1.5 times the <br />$10,000 number. <br />3. Are the larger lots subsidizing the smaller lots? <br />To the extent that sewer is going to oe installed adjacent to <br />a large lot, a lot with a large frontage actually costs more <br />to serve than a lot with a smc;ll frontage. To the extent <br />that sewer is needed the greater number of smaller lots <br />actually, defray the cost for the larger lots. (This is <br />balanced out by splitting the areas between the larger and <br />smaller lots and having the lateral cost for the smaller <br />lots, in this case, being less than for the larger lots.) <br />4, Aren't there other plac4..r, such as Cygnet Pl-ce, tha i the <br />future will need to have sewer? <br />Tl-e City staff h.ij looked at Cygnet Place a as sewering <br />and what impact that has on this project- It is anticipated <br />that that area will be looked at over the next 5 or 10 years. <br />Whether the area needs sewer would be the subject of a Waste <br />Management Study and will be dependent, not only, on lot size <br />but also topography, soil conditions, water table etc. We <br />looked at it as to how a sewer pipe will be run on an <br />approximate basis.
The URL can be used to link to this page
Your browser does not support the video tag.