My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-26-1990 Countil Packet
Orono
>
City Council
>
1990
>
03-26-1990 Countil Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2024 2:17:06 PM
Creation date
10/14/2024 2:15:38 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project 80-1 - In this project th#> original assf^ssra^nt <br />had been made prior to the project completion. The City <br />subsequently reduced the project assessment to reflect <br />the actual costs of the project. <br />Project 73-1 - After the initial assessment the project <br />assessment was reduced by the City prior to a final <br />Court disposition for those who participated in the <br />appeal process (123 of 266) parcels in the project with <br />the possibility that the city may have to pay for <br />additional assessments over and above those that they <br />had picked up on the front end. This however# was not <br />required because the combination of a refunding of the <br />bond issue for a lower interest payment, prepayments and <br />high interest rates <br />cost. <br />in the late *70*s, CovertfOthe entire7 <br />Project 85-1 (Crystal Bay) - This was the second project <br />according to the records that went to Court as an appeal <br />and which was reduced because of that. It is the only <br />project that the amount of the assessment reduction has <br />made it necessary to levy taxes to fund the debt service. <br />The following represent the area served and the approximate pec <br />unit costs of the projects and the year in which they were donex <br />PROJECT AREA SERVED ASSESSMENT N <br />1963-l.A/B Navarre Area Sewer Plant <br />1963-ST/LS Navarre Area Sewer Lines <br />$225.00/Unit <br />$110.00/Acre plus <br />$8.00/FF (Front Foot) <br />iv: <br />1964- L5 <br />1965- LS <br />Navarre Area Sewer Lines <br />(Fagerness Point) Sewer Lines <br />$225.00/Unit plus <br />$8.15/FF <br />$225.00/Unit plus <br />$8,76/FF <br />1965-LS (Sandy Beach) Sewer Lines $225.00/Unit plus <br />$12.00/FF <br />1967-LS-l Orono H.S. & South Side of <br />Hwy 12 from Willow Dr to <br />Old Crystal Bay Road - Sewer <br />1976-LW-l - Water <br />$60.00/Unit plus <br />$5.99/FF <br />$1050.33/Unlt plus <br />$7.79/FF <br />1969-LS-l Shore Hills Sewer Lines - <br />Navarre <br />$225.00/Conn <br />(Connection) plus <br />$3211.33/Unit <br />ii
The URL can be used to link to this page
Your browser does not support the video tag.