My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-14-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
10-14-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2024 3:10:35 PM
Creation date
10/11/2024 9:53:39 AM
Metadata
Jump to thumbnail
< previous set
next set >
Sticky Note
ID:
1
Text:
Do you want to include legal costs here too?
ID:
2
Text:
And legal costs?
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br /> <br /> <br /> <br />4. BILLS. The Owner shall pay the pass through bills reflecting the costs that <br />City will incur with respect to the plan review and construction observation inspections <br />of the improvements by City staff. <br /> <br />5. DESIGN. The Owner will design the sewer relocation, determine <br />construction limits, obtain necessary permits, hire a contractor, manage the contract, and <br />pay for the improvements. Other items included are street pavement patching, concrete <br />curb and gutter, concrete driveway aprons, concrete sidewalks, coordination with private <br />utilities, irrigation repairs, and notification to neighbors about the project. <br /> <br />6. APPROVAL. City must provide written approval of the design of the sewer <br />line relocation and Owner must provide the required easements to the City on or before <br />____________, 2024 or this Agreement shall be null and void. <br /> <br />7. ESCROW. The Owner and City shall enter into a separate escrow agreement <br />for the sewer line relocation project described in this Agreement. The separate escrow <br />agreement will operate to guarantee completion of the requirements in this Agreement <br />and for payment to the City for all out-of-pocket costs the City will incur with respect to <br />the review and inspection of the improvements by City staff. <br /> <br />8. AS-BUILT DRAWINGS. After the completion of the sewer line relocation, <br />the Owner must provide to the City an As-Built Drawing to track any changes between <br />the original plans and the completed project that may take place during the construction. <br /> <br />9. NOTICES. Any notice given under this Agreement shall be deemed given on <br />the third business day following the date the same is deposited in the United States Mail <br />(registered or certified) postage prepaid, addressed as follows: <br /> <br />If to Owner: XXXXXX <br /> 4215 Forest Lake Drive <br /> Orono, MN 55391 <br /> <br /> <br />If to City: City Administrator <br /> City of Orono <br /> 2750 Kelley Parkway <br /> Orono, MN 55356 <br /> <br />10. INCORPORATION OF RECITALS AND EXHIBIT. The Recitals at <br />the beginning of this Agreement and the Exhibit attached to this Agreement are true and <br />correct, and are incorporated into and made part of this Agreement. <br /> <br /> <br />IN WITNESS WHEREOF, City and Owner have entered into this agreement as <br />of the date and year first above written. <br />155
The URL can be used to link to this page
Your browser does not support the video tag.