Laserfiche WebLink
<br /> <br /> <br />21 _________ <br /> Initial <br /> <br /> <br />Testing <br />The pump shall be tested after the pump and all its associated piping and equipment have <br />been installed on the fire apparatus. The tests shall be conducted at the manufacturer’s <br />approved facility. <br /> <br />The testing shall include at least the pumping tests, the priming device test, the vacuum <br />test. The water tank-to-pump flow teat, and the piping integrity test. <br /> <br />188