Laserfiche WebLink
� o� <br /> � O � O CITY of ORONO <br /> � <br /> � �+ RESOLUTION OF THE CITY COUNCIL <br /> � '�, � ��� No. 6U89 <br /> � <br /> �`�k'ESHOg'� <br /> CONCLUSIONS, ORDER AND CONDITIONS <br /> NOW, THEREFORE, BE IT RESOLVED, that based upon one or more of the <br /> findings noted above, the City Council of the City of Orono hereby grants Preliminary Plat <br /> Approval for a 3-lot plat per the Pre imi ary Plat survey/drawing by Mark S. Gronberg of <br /> Gronberg & Associates, Inc. dated !0 3 and attached hereto as Exhibit A, subject to the <br /> following conditions: <br /> 1) Approval is subject to Minnehaha Creek Watershed District (MCWD) approval and permits <br /> as required. Final plat approval shall not be granted until the Developer has provided <br /> evidence that all required MCWD permits have been obtained. <br /> 2) The Preliminary Plat approval granted by this Resolution shall expire one-year from the <br /> approval date (October 24, 2012). <br /> 3) The Developer shall construct the required storm water pond/facilities on the Property. <br /> � _ 4) The City will construct and install off-site storm water facilities to be paid for via the <br /> Stormwater Fund. <br /> 5) The Property is limited to 25% hardcover per MN §462.357. <br /> 6) Development Fees. <br /> a) Park Dedication Fee. The development is not subject to the standard Park Dedication <br /> Fee requirement because no additional residential lots are being created. <br /> b) Storm Water and Drainaqe Trunk Fee. The development is subject to the standard <br /> Storm Water and Drainage Trunk Fee of $4,990 per acre x 1.239 total acres = <br /> $6,185.95. <br /> c) Metropolitan Council Sewer Availabilitv Charqe. Three properties are proposed to be <br /> connected to City sewer. The 2011 Met Council's SAC rate is $2,230 per unit. 3 units x <br /> $2,230 = $6,690 to be collected for pass through to Met Council at the time of the <br /> building permit issuance for each lot (subject to annual Met Council rate increases). <br /> d) Sewer Connection Charges. The sewer connection charges were assessed for existing <br /> Lots 8 through 13 with the 1965 sewer project. No City sewer connection charges will <br /> be due at the time of connection. <br /> � 7) Approval is subject to the existing and ongoing recommendations of the City Engineer. <br /> Page 3 of 7 <br />