My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-26-1990 Council Packet
Orono
>
City Council
>
1990
>
02-26-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 10:39:24 AM
Creation date
9/6/2024 10:31:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
^ 113190.Ir0if0ctn(iauaro the citv has been exploring the possibility , you are ^^3 i„ your area. Two lnfot«atlooal;V:rr^"\:“ro?Uu}o^ Joe . .e «art.":7a ioJV^rr .‘ifutru/«?r:i«::"yo:r X«e\ o. Ut.rea. in eOi, project, individual property owner.Itloated assessment dollar Hot!d o^"^ha^"‘dVcLent"tr°e^h^to^lowin9 additional charges for <br />; each individual property owner would be responsible. <br />rtn rrtshs - This is the cost to you of hiring <br />r;:ratrrntrtorVo%o:nect .our house to the municipal <br />sewer in the street. <br />.ml, /car^ - The Metro Waste Control <br />sewer Availability ^ "fc,,,. „itb each new <br />rntVj" ^Tu rhar,rcC:re„tly U ..00.00 a„d is due and <br />payable when you come in for a permit to hookup. <br />1. e«;i oer auarter. This charge is <br />sewer system, to co This charge has not beenreplacement costs of the system. This charge <br />increased for the last four years. <br />The City has worked ^“‘^Ve"Vtil\Jtrn^"UVidring't“ <br />:rtrrn:rire"'des7g:s or layout based on individual <br />eowner or neighborhood suggestions. <br />__ _ _- sewer project to each property owner is <br />Ttiorofthe ovetall construction and restoration costs, the unction ot tne ovetoi* served, and the <br />;hod Of distributing cost th® p P . consistent <br />.liability <>' °“‘%‘Vll pas sewer p^ole^Vs has been that <br />Llosophy in virtually a 9 P <br />fh rrtruu\f:n^^::: -‘ren^rVl ta« case. The present <br />Council direction is that this area would also pay itaelf. City staff have investigated the availability of project funding froB other sources, and we believe we have exhaused all avenues with no success. However, if residents are aware of specific sources we would be happy to pursue those leads.M PETITION/APPEAL WAIVER PROCESSIf you are interested in having the sewer project go forward at the cost indicated, please sign the appeal waiver and petition enclosed and return as early as possible. If the project goes ahead, you will have the right to appeal only the amount in excess of the estimate on the form. If the project costs more than that figure, you will be requested to pay the higher amount. However, if the project costs less than the estimate, your cost will be sirailarily reduced.The City Council will proceed to the next step, ordering plans, specifications, and bidding, if at least 70% of the <br />property owners agreed to sign the waiver. The cost of the <br />"plans and specifications" step is approximately $20,000-$30,000. <br />If there is not significant interest in the project going ahead, <br />this step would likely not be undertaken. <br />If you are not interested in the sewer system, it would be <br />helpful, although not mandatory, if you would indicate that by <br />returning the waiver unsigned and indicating that you are not <br />interested. <br />If you are in one of the two areas where a lateral at this <br />time would be optional, but you agree to accept the trunk charge <br />of $6,500, please indicate that by selecting that option on the <br />appendix in your packet. <br />If the project is bid, the City will then hold a public <br />hearing for the special assessment and based on that hearing the <br />Council will decide whether to adopt a special assessment. Note <br />that the City could adopt a supplemental assessment should the <br />project costs come in greater than the original assessment. If <br />the special assessment is adopted, the City will then wait the <br />legally required 30 day appeal period. Based on the extent of <br />appeals, the City Council will then determine whether it is <br />appropriate to order the project in <br />SOME FINAL THOUGHTS
The URL can be used to link to this page
Your browser does not support the video tag.