My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6526
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7499
>
Reso 6500 - 6599 May 11, 2015 - March 14, 2016
>
Resolution 6526
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2015 8:33:33 AM
Creation date
10/27/2015 8:32:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF URON10 <br />RESOLUTION OF THE CITY COUNCIL <br />NO. <br />6526 <br />either as a separate document or incorporated into the development covenants. The City <br />will grant a road length variance based on the findings noted above. <br />C. Access to Lots 1 and 2, Block 1 shall be a private shared driveway extending from <br />Sixth Avenue North within a private road corridor depicted as Outlot D in Exhibit B, <br />ending in a cul-de-sac or a hammerhead backup apron subject to Fire Department <br />approval. Lot 2, Block 1 shall gain access to the end of the shared driveway via an <br />individual driveway within Outlot F. The shared driveway in Outlot D shall be privately <br />maintained but because it is serving just two homes, underlying City easements shall not <br />be required; a shared driveway easement and covenant shall be established between the <br />two lots being served. Final road design shall include a turnaround configuration (cul-de- <br />sac, hammerhead, or other configuration deemed acceptable by the fire marshal) at the <br />northern terminus of Outlot D. <br />d. Approval of the two access locations serving Lots 1 through 8, Block are <br />specifically subject to approval by Hennepin County. In the event that Hennepin County <br />does not approve these access locations, this Preliminary Plat Approval shall be subject to <br />further City Council consideration. <br />10. Development Fees <br />A. Park Dedication Fee. The development is subject to the standard Park Dedication <br />Fee requirement. Because the value of each newly created lot will be in excess of <br />the threshold value of $69,375.00 the 8% park fee cap of $5,550 per lot will <br />apply. Park dedication fee will be 10 lots x $5,550 = $55,500. <br />B. Storm Water and Drainage Trunk Fee. The development is subject to the standard <br />Storm Water and Drainage Trunk Fee of $7,680 per lot x 10 new lots = $76,800. <br />11. City Engineer Recommendations and Approval. Applicant shall adhere to the -general <br />recommendations of the City Engineer in his comment letters dated 5/13/15, 7/8/15, and <br />7/22/15 as well as ongoing recommendations relating to any issues that arose after the <br />City Engineer's comment letters. Final plat approval shall be granted only upon <br />confirmation by the City Engineer that all engineering concerns have been satisfactorily <br />addressed. <br />12. Plans and Specifications. The following plans and specifications shall be submitted for <br />review and approval by the City and other appropriate jurisdictions prior to final plat <br />approval, to ensure that the proposed plat will accomplish the intended purposes: <br />Draft 7127/15 MPG <br />Page 10 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.