Laserfiche WebLink
^ENTS <br />'dANUAL <br />^rchitectural speci- <br />n.s thereof, shall <br />litions which may <br />in articles of these <br />in Division 15 - <br />includes the furnish- <br />and service necessary <br />ical worK as snown <br />In general, this con- <br />water, cooling coils, <br />sulation, controls, <br />ecessary to complete <br />:ient to operate as <br />as to preclude explicit <br />the following outline <br />ounting of worK require <br />twork. <br />ctwork. <br />ell water coils. <br />tem to Lake/Lagoon. <br />scelianeous piping. <br />ected piping. <br />nevs.* <br />n each furnace, <br />the said equipment, <br />g of all systems. <br />ntemplated, each bidder <br />amiliarize himself <br />ions affecting the <br />ensatiun will be <br />nderstanding as to <br />of knowledge of any <br />ork shall be coordinated <br />PART 2 - PRODUCTS <br />2.01 SUBSTITUTIONS <br />A. <br />A. <br />B. <br />C. <br />D. <br />The equipment of manufacturers which are not named, but which <br />a equa m all respects to the equipment specified may be <br />''‘ll only be ccnsideJerur^oseven 1,) .ays prior to receipt of bids and must be aonroved <br />by written addendu,,. The cost ot any changes of work Sf <br />til ^ substitutions Shill be L <br />the contractor making the substitutions. Within seven (7) <br />days after award of contracts, the Contractor shaUsSbmii <br />to the Engineer a "Preliminary Submittal List" of materials <br />and equipment and where applicable, the name of the install inn <br />suocontractor he proposes to furnish or use. installing <br />2.02 SUBMITTALS <br />Submit shop drawings, manufacturer's data and certificates <br />for equipment, materials and finish, and pe?tine^t deHus <br />fnd hJv” specified in each individual section <br />VubinUtils^ <br />name, catalog model or number,"lImepIIirdI?a."tue“?Iyout <br />sP-incation “;d"fIag»^I “ <br />P?opIIIs““f fill's”!' compuahci of each Item the^°I„!!"?I^'' <br />Shop drawings: All drawings shall be accurate and to a scale <br />of thritei^ large enough to show all pertienent aspects <br />viels iirT^n include floor plans, sectionalviewo, wiring diagrams and installation details of equioment- <br />loLlTnn^"'r^ identifying and indicating proposef ' <br />nane^« iayout and arrangement of items of equipment, control <br />panels, accessories, piping, ductwork and othe? i^e^s ^h^r <br />must oe shown to assure a coordinated installation Wirina <br />internal“-w?;Li'^®o’''^^ circuit terminals and indicate the <br />between each i^en nfequipment and interconnection oet«e_n each item of equipment. Drawings shall indicate <br />aaequate clearance for operation, maintenance and replacement <br />be"isllmulll."" «-P'bbls eguipme„?"and <br />«d char. <br />p' equipment must con- <br />N'a-ion^ ? organizations such as the AmericanNa.ionax Standaids Institute (ANSI), Amercian Society for <br />testing and Materials (ASTM), National ElectricarMaLfal- <br />uteis Association (NEMA) and Underwriters Laboratories <br />15010-.?