My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-08-11 Mechanical Specifications
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1535 Bohns Point Road - PID: 08-117-23-44-0025 - New PID
>
1535 Bohns Point Rd - PID: 08-117-23-44-0023 - Old PID
>
Permits (2)
>
1986-08-11 Mechanical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2024 2:02:05 PM
Creation date
8/28/2024 1:59:22 PM
Metadata
Fields
Template:
x Address Old
House Number
1535
Street Name
Bohns Point
Street Type
Road
Address
1535 Bohns Point Road
PIN
0811723440023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ENTS <br />'dANUAL <br />^rchitectural speci- <br />n.s thereof, shall <br />litions which may <br />in articles of these <br />in Division 15 - <br />includes the furnish- <br />and service necessary <br />ical worK as snown <br />In general, this con- <br />water, cooling coils, <br />sulation, controls, <br />ecessary to complete <br />:ient to operate as <br />as to preclude explicit <br />the following outline <br />ounting of worK require <br />twork. <br />ctwork. <br />ell water coils. <br />tem to Lake/Lagoon. <br />scelianeous piping. <br />ected piping. <br />nevs.* <br />n each furnace, <br />the said equipment, <br />g of all systems. <br />ntemplated, each bidder <br />amiliarize himself <br />ions affecting the <br />ensatiun will be <br />nderstanding as to <br />of knowledge of any <br />ork shall be coordinated <br />PART 2 - PRODUCTS <br />2.01 SUBSTITUTIONS <br />A. <br />A. <br />B. <br />C. <br />D. <br />The equipment of manufacturers which are not named, but which <br />a equa m all respects to the equipment specified may be <br />''‘ll only be ccnsideJerur^oseven 1,) .ays prior to receipt of bids and must be aonroved <br />by written addendu,,. The cost ot any changes of work Sf <br />til ^ substitutions Shill be L <br />the contractor making the substitutions. Within seven (7) <br />days after award of contracts, the Contractor shaUsSbmii <br />to the Engineer a "Preliminary Submittal List" of materials <br />and equipment and where applicable, the name of the install inn <br />suocontractor he proposes to furnish or use. installing <br />2.02 SUBMITTALS <br />Submit shop drawings, manufacturer's data and certificates <br />for equipment, materials and finish, and pe?tine^t deHus <br />fnd hJv” specified in each individual section <br />VubinUtils^ <br />name, catalog model or number,"lImepIIirdI?a."tue“?Iyout <br />sP-incation “;d"fIag»^I “ <br />P?opIIIs““f fill's”!' compuahci of each Item the^°I„!!"?I^'' <br />Shop drawings: All drawings shall be accurate and to a scale <br />of thritei^ large enough to show all pertienent aspects <br />viels iirT^n include floor plans, sectionalviewo, wiring diagrams and installation details of equioment- <br />loLlTnn^"'r^ identifying and indicating proposef ' <br />nane^« iayout and arrangement of items of equipment, control <br />panels, accessories, piping, ductwork and othe? i^e^s ^h^r <br />must oe shown to assure a coordinated installation Wirina <br />internal“-w?;Li'^®o’''^^ circuit terminals and indicate the <br />between each i^en nfequipment and interconnection oet«e_n each item of equipment. Drawings shall indicate <br />aaequate clearance for operation, maintenance and replacement <br />be"isllmulll."" «-P'bbls eguipme„?"and <br />«d char. <br />p' equipment must con- <br />N'a-ion^ ? organizations such as the AmericanNa.ionax Standaids Institute (ANSI), Amercian Society for <br />testing and Materials (ASTM), National ElectricarMaLfal- <br />uteis Association (NEMA) and Underwriters Laboratories <br />15010-.?
The URL can be used to link to this page
Your browser does not support the video tag.