My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-08-11 Mechanical Specifications
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1535 Bohns Point Road - 08-117-23-44-0025
>
Permits/Inspections
>
1986-08-11 Mechanical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2024 2:02:05 PM
Creation date
8/28/2024 1:59:22 PM
Metadata
Fields
Template:
x Address Old
House Number
1535
Street Name
Bohns Point
Street Type
Road
Address
1535 Bohns Point Road
PIN
0811723440023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br />I , <br />C_^ <br />k > <br />.n <br />1.01 <br />A. <br />1.02 <br />A. <br />A. <br />SECTION 15410 <br />WELL WATER SYSTEM <br />PART I - GENERAL <br />SCOPE <br />Section 15010 Mechanical General Requirements and all gen <br />eral and supplementary conditions of this project manual <br />apply to all vorK under this section. <br />DESCRIPTION OF WORK <br />The work includes providing new well water piping systems <br />and related work. The work also includes providing roughing <br />in and making final plumoing connections co HV^AC equip <br />ment furnisheo under various sections of the specification. <br />Provide each system complete ana ready for operation. The <br />inscailation and workmanship shall be in accordance with <br />the ttate Plumbing Code. Capacicy of equipuiant snarl be <br />not less than that indicated. The work also includes <br />underground piping aiscnarging water into the lake. <br />B. RELATED WORK <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />Section <br />Section <br />Section <br />Section <br />Section <br />Section <br />Section <br />15015 <br />15020 <br />15050 <br />15060 <br />15090 <br />15100 <br />15180 <br />Disinfection of Well Water Lines <br />Testing, Adjusting and Balancing <br />Basic Materials and Methods <br />Pipe and Pipe Fittings <br />Hangers and Supports <br />Valves <br />Insulation <br />1.03 JOB CONDITIONS <br />Water service shall be extended from the pressure tank <br />in gun range. This Contractor shall make final connection. <br />1.04 SUBMITTALS <br />A. Manufacturer's Data <br />1. Gauges and thermometers <br />2. Strainers <br />3. Water hammer arrestors <br />4. Backflow preventers <br />5. Circulating pumps CP-1 and CP-2 <br />B. Certifications of Compliance <br />1. Backflow preventers <br />C. Certified Data <br />1* Backflow preventers <br />15410-1 <br />1
The URL can be used to link to this page
Your browser does not support the video tag.