Laserfiche WebLink
V <br />I , <br />C_^ <br />k > <br />.n <br />1.01 <br />A. <br />1.02 <br />A. <br />A. <br />SECTION 15410 <br />WELL WATER SYSTEM <br />PART I - GENERAL <br />SCOPE <br />Section 15010 Mechanical General Requirements and all gen <br />eral and supplementary conditions of this project manual <br />apply to all vorK under this section. <br />DESCRIPTION OF WORK <br />The work includes providing new well water piping systems <br />and related work. The work also includes providing roughing <br />in and making final plumoing connections co HV^AC equip­ <br />ment furnisheo under various sections of the specification. <br />Provide each system complete ana ready for operation. The <br />inscailation and workmanship shall be in accordance with <br />the ttate Plumbing Code. Capacicy of equipuiant snarl be <br />not less than that indicated. The work also includes <br />underground piping aiscnarging water into the lake. <br />B. RELATED WORK <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />Section <br />Section <br />Section <br />Section <br />Section <br />Section <br />Section <br />15015 <br />15020 <br />15050 <br />15060 <br />15090 <br />15100 <br />15180 <br />Disinfection of Well Water Lines <br />Testing, Adjusting and Balancing <br />Basic Materials and Methods <br />Pipe and Pipe Fittings <br />Hangers and Supports <br />Valves <br />Insulation <br />1.03 JOB CONDITIONS <br />Water service shall be extended from the pressure tank <br />in gun range. This Contractor shall make final connection. <br />1.04 SUBMITTALS <br />A. Manufacturer's Data <br />1. Gauges and thermometers <br />2. Strainers <br />3. Water hammer arrestors <br />4. Backflow preventers <br />5. Circulating pumps CP-1 and CP-2 <br />B. Certifications of Compliance <br />1. Backflow preventers <br />C. Certified Data <br />1* Backflow preventers <br />15410-1 <br />1