Laserfiche WebLink
n\ <br />mi <br />i <br />IL <br />B. <br />3.06 <br />A. <br />B. <br />Provide tvo~pipe alignment guides and one anchor on each <br />side of expansion loops and in other locations as shown on <br />drawings or as required by manufacturer of joints. Pipe <br />guides and anchors shall be approved types and be of size <br />required. This contractor at his option may provide shop <br />fabricated anchor and guide approved by Engineer. <br />CONCRETE INSERTS <br />Install as required to properly support piping and equipment <br />encountered. <br />The contractor requiring the insert is responsible for place­ <br />ment of same and any coordination necessary between other <br />trades. <br />END OF SECTION <br />1S090-S <br />A