My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-12-1990 Council Packet
Orono
>
City Council
>
1990
>
02-12-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2024 1:31:11 PM
Creation date
8/23/2024 1:21:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
spment Plan Page 3 <br />\ and Uban. Inc. <br />Navarre Redevelopment Plan Page 4NINGjreliininary concept plans and alternatives to illustrate potential future land uses, 1, open space, major utilities, and potential building scale and location, * 3" 5summary of the pertinent data and development statistics for the properties under :ion, including size and nature of development activity, existing and future land and alues, and fiscal implications. ^ ^memorandum summarizing in ••'•■n'ter. and grapltic form the alternative concepts and information described above, and present it to the City Council and Plannmg Com- his memorandum will include traffic generation analysis reflecting the potential impact id land use changes on surrounding streets. -‘-'i ^ )>iixhibits and data suitable for public presentation of the the key issues and concepts <br />jnd prepare a presentation of these and other important information for the workshop <br />'ity Council and Planning Commission.- <br />LEMENTATION <br />mendments to the Comprehensive Plan, with findings as appropriate, which reflect the <br />adopted in the previous phase, for review and approval by the Planning Commission <br />Council with the adopted results prepared for submission to the Metropolitan Council. <br />;ation with City administrator, City Attorney, and other staff, prepare amendments to <br />ig Ordinance to implement the concepts adopted in the previous phase, including <br />n of new Zoning Districts to the properties in the study area, changes to the Official <br />lap, and enhanced performance standards to protect the integrity of existing surround- <br />ises and to guide future developments. <br />ity’s direction and working closely with the CITY Fiscal Consultant 3od CITY staff, <br />SULTANT will pr<?nare a prdiminary Tax I.ncreme.".! Financing Feasibilir/ Study. <br />lAL REPORT (Optional) <br />sare and have printed a final report documenting the research, analysis, goals, plans, <br />itation tools, and promotion strategies outlined in all phases above. The report will be <br />wo color printing of graphics, and high quality materials and design. <br />PUBLIC HEARINGS AND PRESENTATIONSIt is anticipated that five (5) presentations before the Planning Commission and City Council may be required in the pursuit of final approval of the planning study. It is also anticipated that at least two public hearings may be required. All additional meetings and revisions will be charged for on a time plus materials basis.PRODUCT TO BE PROVIDEDThe CONSULTANT shall provide the CIT'f with written and graphic materials in memorandum form <br />as may be required during the review of this project. Board mounted, color rendered e.thibits and slides <br />will be prepared for purposes of public presentations. At the CITY’S option the CONSULTANT will <br />publish a final report printed on high quality paper with uvo color graphics and bound in one volume. <br />INFORMATION TO BE FURNISHED BY THE CITY <br />The CITY shall be responsible for providing legal, engineering, surveying, and municipal fiscal con <br />sulting services as may be required. The CONSULTANT shall work in dose liaison with these e.xperts <br />throughout the course of the project. None of these services will be requested without prior consent <br />from the CITY. <br />The CITY shall be responsible for providing updated information, including legal descriptions, aerial <br />photos, section maps, fiscal data, topography (if available), and City infrastructure and utility informa <br />tion. <br />COMPLETION TIME <br />The work outlined above will begin immediately upon receipt of the e.xecuted contract and will be <br />completed as expeditiously as possible with work for STAGE I being completed within 60 days of <br />commencement, unless delayed by reason of une.xpected emergencies, forces beyond the control of the <br />parties, or by request of a party acquiesced in writing by the other p.irty If so delayed for more than <br />ninety (180) days at the request of the CLH', the CONSULTANT reserves the right to renegotiate <br />the contract to account for rising costs before resuming work. <br />Dahisren. Shardlow. and Uban. Inc.
The URL can be used to link to this page
Your browser does not support the video tag.