Laserfiche WebLink
2790.1 r. r /'• V" r •' 12 ‘ritv CouncilMayor ana Mmlnlstrat.M,r. E. Eernnarason, CUyFebruary ^bine r.aslblUty Stuay t. Highway 12 sanitary.ent: h- ^rogosea Heaolution,, Councll-a les' "'^^i^’rasoVution tor»allyunaertaken. <br />:rthat aecislon. ^^„„„aea « >PP;o« Eeeo^^ <br />:ing commission P'^®^ *_ded to include <br />•—■"■ “••• *' ‘ <br />ItVis^'orAere^^ approve <br />seconded t>y —' prepays * <br />- Moved by tr-'ritv Engineer to p ^ force <br />POSED a irec ting the l°®®VavRoad from the <br />llb^lfty Vtuay^ -\%Vt"h on old ,";\\?Metr"opolit^;^^^^^ <br />n/gravity sew ^’’^fon'^at 100° ^l^of^the feasibility <br />"to the projectinto <br />A RBSOLOTIOM ORDERING A FEASIBILITY STUDY FOR A SANITARY FORCBMAIN/GRAVITY TRUNK SBNSR LINE OLD CRYSTAL BAT ROADWhereas* the City of Orono has constructed sanitary sewer and water improvements adjacent to Highway 12 known as the Highway 12 Sanitary Sewer and Water Impro'/ements, andWhereas* the existing sanitary sewer trunk line adjacent to the Burlington Northern Railroad in Long Lake is not of adequate size to accept the increased flows from the Highway 12 improvement area * andWhereas* there is an alternate route for a sewer line that would accept the increased flows, that being a force main/gravity sewer line south on Old Crystal Bay Road from the Burlington <br />Northern railroad to the Metropolitan Waste Control Commission <br />Pump Station at 1000 Old Crystal Bay Road, and <br />Whereas* the most efficient manner in which to obtain the <br />necessary information and costs is to perform a feasibility <br />study. <br />Mow therefore* be it resolved that the City Council does <br />hereby direct the City engineer to prepare a report as to the <br />feasibility and costs of a project not to exceed $6,000.00. <br />Adopted by the City Council of the City of Orono this 22nd <br />day of January 1990. <br />James R. Grabek, Mayor <br />ATTEST: <br />Dorothy Hallin, Clerk <br />Page 1 of 1