My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-12-1990 Council Packet
Orono
>
City Council
>
1990
>
02-12-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2024 1:31:11 PM
Creation date
8/23/2024 1:21:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2790.1 - • / / •: .rf- <br />TO: <br />FROM: <br />Mayor and City Council <br />Mark E. Bernhardson, City Administrat <br />■ 1 ? ■ • • . <br />OATS: February 1, 1990 <br />SOBJBCT: Highway 12 Sanitary Sewer Trunk Line Feasibility Study <br />Attachment: A. Proposed Resolution <br />INTRODUCTION - At the Council's last meeting they directed that <br />the feasibility study be undertaken. The resolution formally <br />directs that decision. <br />RECOMMENDATION - It is recommended to approve Resolution <br />direcFing the City Engineer to prepare a feasibility study <br />relating to the location of a force main/gravity sewer line south <br />on Old Crystal Bay Road from the Burlington Northern Railroad to <br />the Metropolitan Waste Cfmtrol Commission pump station at 1000 <br />Old Crystal Bay Road. It is additionally recommended to include <br />the costs of the feasibility study into the project costs if a <br />project is ordered. <br />PROPOSED MOTION - Moved by , seconded by _, to approve <br />Resolution I directing tKe" City Engineer to prepare a <br />feasibility ^"tudy relating to the location of a force <br />main/gravity sewer line south on Old Crystal Bay Road from the <br />Burlington Northern Railroad tracks to the Metropolitan Waste <br />Control Commission pump station at 1000 Old Crystal Bay Road. It <br />is additionally approved to include the costs of the feasibility <br />stuc into the project costs if a project is ordered. Ayes —, <br />Nays
The URL can be used to link to this page
Your browser does not support the video tag.