Laserfiche WebLink
i*.' ji’ <br />Exhibit A <br />Orono Pool and Clasiroom Addition <br />Dacanbar 5, 1989 <br />Paga Three <br />38. <br />39. <br />40. <br />42. <br />43. <br />44. <br />49. <br />50. <br />51. <br />52. <br />54. <br />56. <br />57. <br />58. <br />59. <br />Substitute alternate carpet for the <br />Bigelow's "Interwove Highlights" <br />specified.$ 5,632 <br />Use aluninuin conductors for services from <br />transformer to main panel and main to <br />sub-panels. I <br />Change cast iron soil pipe to PVC. f <br />Substitute vacuum sand filter for <br />Diatumatious Earth vacuum system as <br />specified. I <br />Use No. 10 stainless for ramp rail. | <br />Substitute 6" of Class 5 for paving of <br />^ire lane in rear of building. | <br />Substitute fiberglass board for ceramic <br />acoustic board in office and locker room <br />ceilings (Rooms 106, 107, 133, 134) | <br />Delete surge tank and related valves, <br />piping and transfer pump. <br />Omit custom color frame; use standard <br />size windows. <br />Omit all exterior walks on west side of <br />building. I <br />Omit cast in place stairs and substitute <br />steel pan poured steps. | <br />Substitute Durafirm 1 meter board for <br />Paragon board specified. <br />Pool sound <br />Pool scoreboard. <br />Redesign front of building. <br />5,000 <br />5,000 <br />4,800 <br />2,000 <br />4,400 <br />2,000 <br />$ 2,000 <br />I 2,000 <br />1,500 <br />1,159 <br />I 1,000 <br />I 14,900 <br />I 12,780 <br />I 25.000 <br />(1996,466) <br />TOTAL CONSTRUCTION 12,674,434