Laserfiche WebLink
Exhibit A <br />Orono Pool and Classroom Addition <br />Dacomber 5, 1989 <br />Pago Two <br />15. <br />17. <br />18. <br />21. <br />23. <br />24. <br />25. <br />28. <br />30. <br />31. <br />33. <br />Revisa construction schadula; bagin <br />Spring of 1990 and avoid tamporary <br />haat costs.I 36,000 <br />Substituta joist and dack for 12'* precast <br />planks at roof in classroom area and <br />mechanical wing. f 28,250 <br />Substitute carpeting for terrazzo in the <br />corridors. $ 27,255 <br />Substitute asphalt paving for concrete <br />paving. | 20,000 <br />Omit full height ceramic wall tile. <br />Substitute 4*0" wainscot in rooms 106, <br />111, 126, 131, 133, 205 and 215.I 16,285 <br />Delete custom light fixtures at pool area <br />and substitute standard metal halide <br />fixtures. | 15,000 <br />Relocate air handling units to roof. | 12,700 <br />Change pool piping from Sch. 80 flanged <br />plastic to Sch. 40 glued. $ 11,000 <br />Delete two courses of block in pool <br />area.I 4,000 <br />Substitute Republic lockers for Debourgh <br />Manufacturing lockers as specified; knock <br />down lockers. I 9,178 <br />Omit front entry wall at ramp and pedestals. <br />Keep stairs and install on grade ramp on one <br />side only. Omit curved portions of slab <br />between ramp and building.$ 8,250 <br />34. Substitute seeding for all sod work. | 8,000 <br />36. Delete ceramic tile floors in locker <br />room nos. 133 and 106 and substitute <br />concrete floor sealer. <br />37. Omit vinyl wall covering; substitute <br />painted walls (two coats). <br />f 7,000 <br />I 6,611