My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-1990 Council Packet
Orono
>
City Council
>
1990
>
01-22-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 2:16:42 PM
Creation date
8/16/2024 10:59:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
if <br />i i <br />Navarre Redevelopment Plan Pages <br />STAGE II <br />PHASE I: PL-iNNING <br />_~,I. Develop preliminary concept plans and alternatives to illustrate potential future land uses. <br />circulation, open space, major utilities, and potential building scale and location.f i jjj <br />2. Prepare a summary of the pertinent data and development statistics for the properties under <br />consideration, including size and nature o^ development activity, existing and future land and <br />building values, and fis^ ircplications. , ^ <br />3. Prepare a memorandum summarizing in vrinen and graphic form the aucrrative concepts and <br />pertinent information described above, and present it to the City Council and Planning Com <br />mission. This memorandum will include traffic generation analysis reflecting the potential impact <br />of proposed land use changes on surrounding streets. f o ly <br />4. Prepare exhibits and data suitable for public presentation of the the key issues and concepts <br />involved, and prepare a presentation of these and other important information for the workshop <br />with the City Council and Planning Commission. <br />^ J <br />PHASE II: IMPLEMENTATION <br />1. Prepare amendments to the Comprehensive Plan, with finding as appropriate, which reflert the <br />concepts adopted in the previous phase, for review and approval by the Planning Commission <br />and City Council with the adopted res. ':s prepared for submission to the Metropolitan Council. <br />2. In consultation with City administrator. City Attorney, and other staff, prepare amendments to <br />the Zoning Ordinance to implement the concepts adopted in the previous phase, including <br />application of new Zoning Districts to the properties in the study area, changes to the Official <br />Zoning Map, and enhanced performance standards to protect the integrity of existing surround <br />ing land uses and to guide future developments. <br />3. At the City’s direction and working closely with the CITY Fiscal Consultant and CITY staff, <br />the CONSULTANT will prepare a preliminary Tax Increment Financing Feasibility Study. <br />phase III: FINAL REPORT (Optional) <br />1. Edit, prepare and have printed a fmal report documenting the research, analysis, goals, plans, <br />implementation tools, and promotion strategies outlined in all phases above. The report be <br />include two color printing of graphics, and high quality materi^ and design. <br />Dihlgren. Shard low, and Uban, Inc. ^
The URL can be used to link to this page
Your browser does not support the video tag.