Laserfiche WebLink
F.. <br />r-'-. <br />r <br />f- <br />? <br />Tos Mayor Peterson and Orono City Council <br />Ron Moorse# City Administrator <br />Michael P. Gaffron, Asst Planning & Zoning Administrator <br />Dates November 5$ 1991 <br />Subjects #1683 Robert F. Suess, 2590 Watertown Road - <br />Preliminary Subdivision <br />toning Districts RR-IB, Single F2unily Rural Residential, 2 acre, <br />Uissewered <br />Applications Request for subdivision of 19.7 acre existing <br />homestead to create two 2-acre building sites <br />List of Bshibits . <br />Exhibit A - Notice of Planning Commission Action 10/23/91 <br />Exhibit B - Planning Commission Minutes 10/21/91 <br />Exhibit C -> Memo & Exhibits of 10/18/91 <br />Exhibit D “ Memo & Exhibits of 9/9/91 <br />Discussion <br />The applicant proposes to create two new 2-acre building <br />sites from his homestead property on Watertown Road. The <br />proposal includes creation of a 50* outlot for future <br />construction of a private road. <br />Each lot has b^en tested and proved suitable for sewage <br />treatment drainfield sites. <br />The applicant contends that this should be considered a 2- <br />lot plat not subject to the requirement for construction of a <br />private road. He is proposing to serve the two new lots with a <br />single driveway constructed within the Outlot, leaving his <br />existing residence access directly onto Watertown Road. <br />Applicant has provided a conceptual plan for a future cul-de-sac <br />to serve as many as 9 lots, and staff has sketched a conceptual <br />plan showing connection to toldenvlew Drive. <br />The City Engineer requested a topographic survey of the <br />entire property, and upon receipt and review of that survey <br />recommended that applicant submit a grading and drainage plan <br />incorporating swales along lot lines, leading to a detention pond <br />in the northeast comer of the property. The Planning Commission <br />did not cosie to unanimous agreement regarding whether they needed <br />to see the final grading plan before making a recommendation to <br />Council .