Laserfiche WebLink
fi <br />■'i' <br />i- <br />MINUTES OF THE ORONO PLANNING COMMISSION MEETING - AUGUST 19, 1991 <br />ZONING FILE #1668 - CONT. <br />Mabusth noted that the Directors of the Watershed District <br />suggested in a preliminary report that filling will need to be <br />done; at least 1-2' above the 1018 elevation. They have also <br />stated that elevations below the 1018 elevation should not be <br />filled. If there Is excavating within the 1018 elevation. a <br />conditional use perinlt/variance application would have to be <br />filed. The drainage from the school can be addressed with <br />grading. The question for the City is how restricted the <br />building envelope will be with this filling. <br />Kelley noted that from the beginning it was his <br />understanding that variances would not be approved for this site. <br />Mabusth indicated that may be the one type of variance that <br />would be approved. <br />* <br />Johnson asked if the outlet is a public right-of-way. <br />Mabusth indicated that this is correct and there will be a <br />temporary cul-de-sac at the end of the outlet. She noted that <br />the City will ask for an easement over the area not included in <br />the 60' outlet. She explained that the outlet is where the <br />hydrants, sewer and water will be placed. <br />Schroeder asked if the northern 10* of the outlet Is to be <br />used as bike trail. <br />Mabusth concurred and explained that it will extend to the <br />Otten and Rebers property. <br />It was moved by Bel lows, seconded by Cohen, to recommend <br />approval of the Class III preliminary subdivision application for <br />the City of Orono for property located at 700 Old Crystal Say <br />Road North. Ayes 6, nays 0. <br />(#2) ZONING FILE #1676 CITY OF ORONO <br />700 OLD CRYSTAL BAY ROAD NORTH <br />CONDITIONAL USE PERMIT <br />PUBLIC HEARING <br />noted. <br />The Affidavit of Publica*c;on and Certificate of Mailing was <br />Mabusth noted that the City Engineer was to conduct this <br />review as the technical expert on this application. She noted <br />that members of the public are present to review location and <br />design information on the water tower but that she could not <br />respond to technical issues or questions. <br />Kelley asked why the proposed water tower location had <br />changed from thv well site, near the Otten property. <br />n <br />1