My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-08-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
07-08-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:16:15 PM
Creation date
7/8/2024 12:08:54 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date: July 8, 2024 Item: 22 <br />Presenter: Adam Edwards, City Administrator / Engineer <br />Section: City Administrator/Engineer Report <br /> <br />Title: Brown Road Improvement Project Planning and Engineering (Project #25- <br />002) <br /> <br /> <br />1.Purpose: <br />The purpose of this action item is to gain council approval to commence the planning and engineering of the <br />Brown Road Improvement Project <br />2.Background: <br />At the May 13, 2024 Council Work Session, the Council provided direction for 2025 street projects. Brown <br />Road which is a Municipal State Aid Street was recommended for 2025. <br />3.Scope: <br />Planning and engineering will consist of topographic surveying, utility inspections, design, permitting, public <br />input and solicitation of bids for select roads. <br />4.Cost: <br /> a. Bolton and Menk has provided a scope of services for a fee estimate not to exceed $49,800 (Exhibit A). <br /> b. The preliminary cost estimate for the project is $506,500. <br />5.Funding: <br />The engineering as well as the eventual projects will be funded with a combination of the Pavement <br />Management and Stormwater Fund. <br /> <br />Fund Cost Estimate Est. 2024 End of Year <br />Fund Balance <br />MSA Fund $ 406,600 $ 998,144 <br />Stormwater Fund $ 93,200 $ 2,256,606 <br />Water Fund $ 900 $ 1,262,509 <br />Sewer Fund $ 5,800 $ 671,171 <br /> <br />Total $506,500 <br />6.Staff Recommendation: <br />I recommend Council authorize the design of the Brown Road Improvement project. <br />AGENDA ITEM <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />COUNCIL ACTION REQUESTED <br />Move to direct the City Engineer to move forward with preliminary planning for the Brown Road Improvement <br />project and acceptance of the Bolton and Menk’s proposal for design. <br />210
The URL can be used to link to this page
Your browser does not support the video tag.