My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-1991 Council Packet
Orono
>
City Council
>
1991
>
07-22-1991 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 10:57:49 AM
Creation date
7/1/2024 10:53:54 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RFP for Ccnstructicn Manager^ent Ser <br />July 1» 1991• <br />Page 3 of 4 <br />vices <br />22. Institution and coordination of the progress payment procedure <br />for contractors. <br />23. <br />24. <br />25. <br />26. <br />27. <br />Procurement and control of construction support requirement for <br />the owner and contractors with respect to any labor <br />relations efforts connected with the project. <br />Design and implementation of the project's quality management <br />CosV*tracking and the administration of the Owner's cost <br />Assl^Vnleresolution of disputes arising from the <br />performance of the contractors. <br />SB8POM8BS MOST IVCLUDB THE FOtLOWING INPORMATION. ADDITIOHAL INPORMATIOH, <br />IF DBSIRBDr MMf BE lECLODED IE ITEM 6. <br />1. <br />2. <br />Construction Management Firm Qualification Statement. <br />Scope of services by phase (construction manager’s approach to <br />fulfilling the "Scope of Work by Construction Manager .) <br />a. Design phase <br />b. Pre-bid, bid and award phases <br />c. Construction phase <br />d. Post construction phase <br />3. <br />b. <br />c. <br />d. <br />e. <br />construction Management Approach (How do you propose to <br />administer this project?) <br />a. Value Engineering <br />Cost control during design <br />Project scheduling <br />Bid phase administration: <br />Mar)ceting project to potential bidders <br />Pre-qualifications of bidders <br />Pre-bid meetings <br />Bid review and interview prior to contract <br />Contractor bonding requirements; <br />Local bidders <br />Effect on construction cost <br />Humber of bids proposed to be requested for project <br />RelaSon^to^Architect in preparing Project Manual <br />On-site project supervision <br />Change order procedures vo <br />Is any of your work force in any way <br />contractors utilized in the actual construction of the <br />Managment and coordination of final start-up, and <br />testing occupancy activites <br />When do CM service terminate? <br />f. <br />g« <br />h. <br />i. <br />k. <br />1.
The URL can be used to link to this page
Your browser does not support the video tag.