Laserfiche WebLink
0 <br />II «« .« 1 « % -. <br />uu.'Vs^ <br />r.O. Boi 3S7. WayzaU. Minnesota S5391 <br />I^BD Of MimfiBtS*^ Spensi6viPres • Aibetii Len»nan • johnE Th(xria^ <br />■cHardR. Milef • Robtll 0 EncKSiXi • C Woodrow Lo\t • Cla(V:>on l.r^Ciey <br />Parmil AnnliMlion No. 90-126 October 22, 1990 <br />Applicant: Clair Rood <br />2215 Kenwood Way <br />Wayzaia, MN 55391 <br />Location: Ciiy of Orotio, Sec. 17DD a <br />Purpose: Dredging to create an open water pond in a wetland and till and excavation in a <br />floodplain area. <br />Dear Mr. Rood: <br />At the regularly scheduled October 18, 1990 meeting of the Board of Managers, the subject permit <br />application was tabled pending receipt of: <br />1.Calculations showing no net decrease in Lake Minnetonka flo^ storage capacity. <br />2.Hydrologic calculations by a professional engineer or qualified hydrologist of the local <br />lOO-ycar frequency flood elevation. • . j i . • <br />3.Calculations providing no net decrease in flood storage capacity below the projected local <br />100-year frequency flood elevation. ... j i. ^ <br />4.Erosion control plan prepared by a qualified individual showing proposed methods of <br />retaining waterbourne sediments on site during the period of work and until bare soil <br />surfaces have been covered or revegetated. rr u <br />5.Delineation and area of the total watershed area contributing stormwater runoff to the <br />wetland. „ • u u •6.Area of the existing wetland and classification of the vegetation types present in the basin. <br />7.Revised plan including proposed elevation contours for the area of excavation. <br />8.Revised plan providing maximum slopes of 4; 1. <br />9.Description of and volume computation of material to be removed. <br />10.Description of equipment which may be used. <br />11.Cbnstruction schedule. <br />[2.Location map of the spoil containment area. <br />13!Erosion control plan for the spoil containment area. <br />14.Review and approval by the City of Orono. <br />15.Review and approval by the DNR. <br />These items should be received no later than November 5, 1990 to ensure your jxrmit application <br />will be on the agenda for the next meeting of the Board of Managers scheduled for November 15, <br />1990.