My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-17-2024 Planning Commission Packet
Orono
>
Planning Commission
>
2024
>
06-17-2024 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2024 9:48:31 AM
Creation date
6/18/2024 11:24:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Katie Fitzsimmons
Created:
6/18/2024 11:29 AM
Modified:
6/18/2024 11:29 AM
Text:
PC Exhibit N
ID:
2
Creator:
Katie Fitzsimmons
Created:
6/18/2024 11:29 AM
Modified:
6/18/2024 11:29 AM
Text:
City Engineer Comments
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
712
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />H:\ORNO\_Surface Water Management\MS4 Administration\MCM-5\2_Site Plan Reviews\Honey Hill\Honey Hill_PrePlatReview_2024-06-06.docx <br /> <br />June 6, 2024 <br /> <br />City of Orono <br />Attn: Adam Edwards <br />2750 Kelley Parkway <br />Orono, MN 55356 <br /> <br />RE: Preliminary Plat Application <br /> Honey Hill <br /> Engineering Review #1 <br /> <br /> <br />Dear Adam: <br /> <br />As requested, I have completed an engineering review of the documents submitted for the above <br />referenced project. Following are my comments for your consideration: <br /> <br /> <br />1. Proposed improvements will require the installation of stormwater runoff management <br />practices to meet Minnehaha Creek Watershed District and NPDES requirements for runoff <br />treatment. The following should be considered regarding stormwater management: <br />a. Per MCWD requirements, the proposed stormwater runoff management system must <br />provide rate control and volume control for the new and fully reconstructed impervious <br />surfaces. <br />b. Per NPDES requirements, the water quality volume must be treated, calculated as 1” times <br />the sum of the new and fully reconstructed impervious surfaces. If infiltration is prohibited <br />as outlined by NPDES requirements, a wet sedimentation basin or filtration basin may be <br />utilized. <br />c. A complete Stormwater Management Plan for the site meeting MCWD and NPDES <br />requirements should be provided for review. <br />d. Per City requirements to track TMDLs and reduce loads to meet required Waste Load <br />Allocations, the calculations for Total Suspended Solids (TSS) and Total Phosphorus (TP) <br />loading should be provided. <br />e. Facilities necessary for the ultimate development (street construction, sewer, basins, etc.) <br />should be installed and the site mass-graded at the same time as street construction to <br />ensure all drainage ways, watersheds, and runoff management systems are constructed per <br />the approved Stormwater Management Plan and are sized adequately for proposed <br />improvements. <br />2. Final Plans should include the following: <br />a. Grading, Drainage, and Erosion Control Plan <br />b. Street Construction Plan <br />c. Landscape and Restoration Plan <br />d. SWPPP meeting NPDES requirements <br />e. City Standard Details <br />3. The applicant will be required to obtain the following permits and provide a copy of any <br />approvals required prior to Final Plat approval: <br />334
The URL can be used to link to this page
Your browser does not support the video tag.