Laserfiche WebLink
r- <br />o o <br />^ t <br />A L ^ <br />A^> I '</ <br />%*ES«0«^ <br />CITY of ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO.Q <br />4. Lot 1 has been found to have suitable soils to support <br />on-site sewage treatment facilities to serve current and <br />future needs. <br />5. Lots 1 and 2 have been found to satisfy all rural <br />standards of the RR-IB zoning district. <br />6. Outlot A has been created for the sole purpose of access. <br />The access road within Outlot A shall serve Lots 1 and 2. <br />Applicants shsll develop covenants for the maintenance of <br />the road and culverts and the responsibility for maintenance <br />of yard areas within the dry buildable portion of Outlot A <br />and eastern portion of Lot 2. <br />7. Outlot B has been created to define the rtimaining portion <br />of the property for future development. Outlot B contains <br />no structures as of this platting and serves as open space <br />areas consisting of the greens area of the golf course. <br />■OW, THBRBPORB BE IT RESOLVED, that based upon one or <br />more of the findings noted above, the City Council of the City of <br />Orono hereby approves the preliminary plat of Fairway Hills <br />Addition per the survey dated December 14, 1990, revised Jf lary <br />22, 1991 by Raymond A. Prasch of Lot Surveys Company, ' ^ • <br />and approves the extension of municipal water d sewer to Lot <br />subject to the following conditions: <br />1. The installation of utilities and driveway within Outlot <br />A shall be subject to the conditions set forth in the <br />resolution approving a conditional use permit and variance <br />for all land alterations. <br />2. Building permits for residential construction on both <br />Lots 1 and 2 shall be issued by the City of Orono. Sewer <br />and water permits shall be issued by the City of Orono for <br />both Lots 1 and 2. The billing for sewer and water usage <br />shall be the responsibility of the City of Orono. Based on <br />the 1991 fee schedule, sewer connection charge for Lot 1 is <br />$7,224.57 and a water connection charge is $3,531.18. <br />Page 2 of 5