My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-1998 Council Packet
Orono
>
City Council
>
1998
>
09-14-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 4:03:32 PM
Creation date
6/5/2024 3:55:42 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />ORONO PLANNING COMMISSION MEETING <br />MINUTES FOR JUNE 15, 1998 <br />02 - #2368 Kirk Otteson - Continued) <br />McMillan, Van Zomeren noted that the City Engineer has not reviewed this <br />r-' “j'“ ®" '«>"■ ‘h' drainage uould be impacted if this addition was built <br />Stoddard stated the Ctty Engineer may need to review this propertv to ensure that the <br />drainage concerns are adequately addressed. <br />he would be willing to reduce the current hardcover bv possiblv removing <br />stoN awav^^^^^ «ihe to <br />Phrn^n! r« — ^ that he has attempted to comply with the <br />Planning Commissions requests. He questioned the top of the blufFlinc since the area under <br />iscussion was very flat. Van Zomeren confirmed that the top of bluff uas detennined by a surveyor. <br />Mc MiIIm stated she also is concerned about setting a precedent with the bluff ordinance if <br />this application is approved as submitted. <br />like to sec hardcover stay the same or be reduced, no encroachment into <br />the bluff, and enclosure of the back deck. Hawn commented the ncu cntrvvvav is fine with <br />the proposed addition not e.xtending beyond the red line. <br />e.\tension to the red line unless the bluff line changes <br />McMillan noted agreement with Lindquist. ^ <br />Otteson stated he would be willing to comply with the red line and would submit revised drawings. <br />c“frffTr°ottvT“ <br />Lindquist moved. Smith seconded, to table Application 2368 to the July 20th Planniiw <br />Commission meeting based on City Staff recommendation. VOTE: Ayes 6, Nays 0. <br />(Agenda Item #3 follows Item #4.) <br />SCHEDULED PUBLIC HEARINGS: SUBDIVISIONS <br />road - PRELIMINARY <br />Christine and Gary Valerius were present. <br />tiil!. the preliminary- sketch plan has been reviewed by the Planning Commission at <br />Inr H‘ • Council at its May 26, 1998 meeting. The applicants arc proposing a two <br />lot division that includes creating one new lot. A small portion of the parcel is locatcd^n the RR-1A <br />toinHnf ? 'V^ remainder lying within the LR-IA zoning district. Van Zomeren noted the <br />total lot area for Lot 1 consists of 2.23 acres, with 1.38 acres being buildable, Tlie newK created Lot I
The URL can be used to link to this page
Your browser does not support the video tag.