Laserfiche WebLink
! <br />1 i <br />ORONO CITY COUNCIL MEETING <br />MINUTES FOR SEPTEMBER 28.1998 <br />(Orono Orchards Sanitary Sewer Project, continued) <br />Lili McMillan questioned whether the last two residences located on L>man Avenue will be able <br />to have gravity flow sewer due to the lowness of the land in that area. <br />Kellogg stated that section of the project has been analyzed and the gravity flow system should <br />\York in that area. <br />A resident inquired whether the $23,700 per unit was the actual cost of the project per residence. <br />Kellogg stated bids have not been received yet and that figure is merely a rough estimate of the <br />projected costs. <br />Mayor Jabbour commented the City Council in the past has attempted to find various means of <br />allocating the costs of the project equitably to each resident, and has determined that the best way <br />of allocating the costs of the project are to assess w hat the City feels is a reasonable cost for the <br />services provided. Mayor Jabbour stated an assessment hearing will be held once the actual bids are <br />received for this project and the costs w ill be assessed at that time. <br />Jane Delaney, 1350 Woodhill Avenue, stated she has spoken w ith Mr. Gappa about this project and <br />w'as told that there were other options that could be explored instead of installing a gravity flow system. <br />Delaney inquired whether the possibility of lift stations being utilized had been explored <br />at all. <br />Mayor Jabbour stated it was his understanding that option had been ruled out. <br />Gappa remarked that grinder pumps are cheaper, but the majority of the residents had requested a <br />gravity flow system. <br />Mayor Jabbour explained that with a grinder pump system, the water gravitates to the deepest hole <br />where it enters a large container in the property owner's basement and then is pumped to the City's <br />sanitaiy sewer system. <br />A resident inquired about the accuracy of the data collected, noting that her system was cited as <br />failing, when in fact it is fine. <br />GafTron stated that sewer systems can be functioning fine one da\ and then a few days later could <br />be found to be failing. Gaffron remarked that he was not sure what Steve Weekman, the Septic <br />Inspector, found. <br />Mayor Jabbour commented that the assessed costs can be put on the tax roll and paid over a ten <br />or fifteen year period of time rather than in a tump sum at the time of installation if the resident so <br />chooses. <br />Kellogg stated all residences in this neighborhood will be hooked up to the Citx-'s sanitary sewer <br />svstem. <br />McMillan inquired w hether a resident has the option of hooking up to the sanitary sew er at a later <br />time if their system is functioning properly at the time the project is commenced. <br />Page 2