My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-28-1998 Council Packet
Orono
>
City Council
>
1998
>
09-28-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 3:41:55 PM
Creation date
6/5/2024 3:30:24 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
477
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#• <br />COUNCIL ACTION REQUESTED: <br />The application has been brought back to the City CouncU by staff to confirm whether or not the <br />current situation meets the original intent of me variances that were granted or is beyond the scope <br />of the variances and requires reconsideration by the Planning Commission. <br />If it meets the intent of the previous resolution, work on the residence may resume without <br />any further City Council action. <br />If it does not meet the intent of the resolution, applicants need direction regarding submittal of a <br />new plan. A new plan would not eliminate the top of bluff setback variance. A new plan may be <br />able to reduce the hardcover by reducing the size of the foundation. The average lakeshore <br />setback variance may be eliminated if the north foundation wall was removed and a new wall <br />constructed 12'-15’ south of the existing foundation wall. <br />Attachments <br />I I <br />J
The URL can be used to link to this page
Your browser does not support the video tag.