My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-1998 Council Packet
Orono
>
City Council
>
1998
>
08-24-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 3:29:26 PM
Creation date
6/5/2024 3:24:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
III. Sanitary Sewer <br />The proposed sanitary sewer for the Orono Orchard area is shown on Figure 2. review of the <br />project site indicates the routes shown on the figures are recommended from a construction <br />standpoint. <br />All residents in the project area would be served by a gravity sewer. The proposed sewer would be <br />constructed using the directional boring method on segments BHG and FCDE. Segments HI and AC <br />would be installed by the open cut method, A lift station would be constructed along Orono Orchard <br />Road and would pump flows into an existing Metropolitan Council Environmental Services <br />(MCES) forcemain. Mainline pipe will be 8-inches in diameter and either HDPE or PVC depending <br />on the method of installation. <br />Sewer services to each home will be 4-inches in diameter. Services will be extended to the property <br />line. The actual connection between the home and the sewer stub will be the property owners <br />responsibility. Estimated costs are shown in the Appendices. <br />An additional design to serve the properties identified as 21,22 and 23 on L>'man Avenue is shown <br />on Figure 4. This pipe would be directionally bored and the street excavated only at the manhole <br />locations. These properties could be included in the project or this sewer segment could be <br />constructed sometime in the future. Property owners should be contacted to determine interest and <br />sewer needs. Cost estimates for this segment are shown in the Appendices as the Lyman Avenue <br />Option. <br />The proposed manholes on Lyman, Smith a.nd Woodhill Avenues would be constructed in the <br />roadway. All sewer pipes, manholes and the lift station along Orono Orchard Road will be installed <br />off of the street on the golf course side. Disturbed street areas will be restored with 1 Vi inches of <br />bituminous wear course, 2 inches of bituminous base course, 12 inches of aggregate base and <br />geotextile stabilization fabric. <br />An alternate design using the open cut method of installation for all pipes shown on Figure 2 was <br />considered. This alternate would increase the total project cost by 37 percent and severely restrict <br />access during construction. A cost estimate for the alternate design is included in the Appendix. <br />Orono Orchard Sanitary Sewer Improvements
The URL can be used to link to this page
Your browser does not support the video tag.