My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-1998 Council Packet
Orono
>
City Council
>
1998
>
08-24-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 3:29:26 PM
Creation date
6/5/2024 3:24:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
* Some shared travel with other projects is assumed. The actual amount of shared <br />travel (pro rata) will afifect the actual cost. <br />SOIL TESTING <br />There are several types of tests required- The putting surfece mix material, tee sand, <br />gravel and bunker sand must be approved by a USGA testing lab. Normally, about six <br />samples are tested initially, with additional check-tests throughout the delivery of material <br />to the site. The total cost for this testing is estimated to be $3,000. <br />SUMMARY - PRE-CONSTRUCTION COSTS <br />DESIGN.................................................................................$75,000 <br />OUT-OF-POCKET EXPENSES...............................................11,175 <br />SOIL TESTING............................................................ 3,000 <br />TOTAL PRE-CONSTRUCTION COSTS...............................$89,175 <br />HARD-CONSTRUCTION COSTS <br />MOBILIZATION <br />There is a cost for the contractor to set-up an operation on-site including mobilization <br />of men and equipment, electrical power, telephone and so on. Based on similar projects in <br />the area, the amount estimated for mobilization is $40,000. <br />Please note, if the project is divided into phases, additional mobilization costs will be <br />necessary (i.e. 3 phases, 3 mobilizations @ $40,000 each). <br />EARTHWORK <br />There are areas on the golf course where lakes will either be added or expanded. This <br />will greatly improve the strategic and aesthetic appeal of Holes #5, 6, and 12. There arc <br />other areas on the golf course where huoq)s hide bunkers or fiiirways, and the hillside to the <br />right of l^e new tees on #16 will need to be cut and lowered. It is antic^ated that the <br />material generated to con^Iete tlJs work will be transported to various locations and <br />utilized to build tees, bunkers and so on. The total material estimated as cut is 27,500 <br />cubic yards. <br />The current estimated price to complete this work with a backhoe and truck (transport) <br />is $3.00 per cubic yard or a total of $82,500. Please keep in mind that if this work is done <br />during less than ideal times or broken up into phases, this price will increase significantly. <br />SHAPING AND FINISHING <br />Shaping is best described as the artistic portion of golf course construction. A talented, <br />high quality shaper is required to create the forms that will improve the golf course features <br />(greens, tees, and bunkers). Conversely, in the overall process of construction, the <br />finishing is the final touch. Even after the features are shaped, the installation of the <br />3
The URL can be used to link to this page
Your browser does not support the video tag.