My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-1998 Council Packet
Orono
>
City Council
>
1998
>
08-24-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 3:29:26 PM
Creation date
6/5/2024 3:24:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
», <br />COST ANALYSIS <br />The identification of line items is as important as the costs themselves. Overlooking a line <br />item can create a difficult cash-flow management situation many times more critical than <br />simply being low on a budget estimate. <br />The purposes of this portion of the study are to identify the scope of work, to discuss the <br />execution in detail and to affix a cost to each portion of the work. However, it is important <br />to note that not all of the planned bunkers can be constructed in this phase because of the <br />repositioning of a feirway or green. <br />The costs are broken down into two areas: Pre-construction and hard-construction. The <br />post construction costs which include grow-in, are normally a part of our study, have not <br />been evaluated by John Fought Design since this information will be organized by Bob <br />Distel and his capable staff <br />During the course of this study, line item costs have been identified. However, <br />should the construction process and scope of work be broken up into a series of <br />years, or the timing of the work be scheduled during a difficult season (i.e. late fall), <br />the cost associated with each line may materially change. Although we have not <br />included a budgeted line item for a contingency, an allowance of 5 • 10% is suggested. <br />Once a definite scope of work and schedule is approved, tty'' ^ contractor bid will provide <br />real numbers. <br />PRE-CQNSTRUCnON LINE fTEMS <br />Portions of pre-construction costs precede construction while the remainder is spread <br />throughout the construction and sometimes even into the grow-in phase. These line items <br />define the funds required for the proper construction documentation of the project and the <br />consultations during the construction. Please note that the irrigation sy.Jtem has not been <br />evaluated in our study. Should the system need to be modified a qua?jfied irrigation <br />engineer will need to be employed. <br />The line items in this category are: <br />DESIGN <br />ENGINEERING* <br />OUT-OF-POCKET EXPENSES <br />SOIL TESTING
The URL can be used to link to this page
Your browser does not support the video tag.