My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-1998 Council Work Session Packet
Orono
>
City Council
>
1998
>
09-23-1998 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 3:20:53 PM
Creation date
6/5/2024 3:20:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
tr:r <br />Draft Work Plan for the Update of the City's Comprehensive Plan <br />September 17, 1998 <br />Page 4 <br />II. <br />Develop clear definition of neighborhood retail. <br />Determine how residential properties adjacent to commercial <br />development can be protected from the impacts of <br />commercial development. <br />Determine the general parameters for commercial <br />development in Navarre - i.e. building size and character, and <br />traffic generation. <br />Obtain input from the Navarre commercial area <br />business/property owners regarding their views of the future <br />of the Navarre commercial area. <br />Housing. Determine whether there are opportunities for the City to address life cycle <br />housing needs. <br />A. There are three potential areas for different housing options. <br />1. The area north of the Highway 12 commercial area, currently guided for <br />medium density residential development. <br />2. The southwest quadrant of Highway 12 and Old Crystal Bay Road. <br />3.The marina areas. <br />B. Action. <br />1.Obtain information regardmg current and future housing needs and demands <br />to assist the Council in determining the types of housing that would meet the <br />City's life cycle housing needs and would be economically feasible. <br />III. Sewer Plan. <br />A.The 1987 Comprehensive Plan Amendment included a planned increase to sewer <br />capacity. This increase will occur as part of the Highway 12 upgrade project. <br />I.The plan for increasing sewer capacity is to eliminate the three City sewer <br />trunk line and increase the capacity of the Metro interceptor to ser\'e the <br />development planned for the Highway 12 area. <br />1
The URL can be used to link to this page
Your browser does not support the video tag.