My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-10-1998 Council Packet
Orono
>
City Council
>
1998
>
08-10-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 3:08:01 PM
Creation date
6/5/2024 3:05:11 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COUNCIL M'££T.:.:. <br />Mayor and City Council <br />Ron Moorse, City Administrator <br />August 7,1998 <br />Summary of Wednesday, August 5 Highway 12 Design Review Committee Meefmg <br />AUG 1 0 1998 <br />CITY c-' : <br />Patti Loken of Mn/DOT indicated she plans to have the preliminary layout completed for <br />oresenmtion to the cities at a joint meeting in early September. At this meeting the cities wouW <br />S the layout and indicate to MnTOOT any issues that needed to be resolved pnor to city <br />approval. <br />Once the ciUes receive the preliminary layout, there is a 90 day review period prior to the <br />S iSg fo receive coirZts regarding the layout. Patti Loken suggeced that it may be <br />wssible for the cities to take some action to shorten the 90 day review period to *e pubte <br />S » be held on a faster timeline. Once the public hearing is held, the cities have 90 days to <br />approve or disapprove the preliminary layout. <br />token reviewed Mn®OTs plan for a temporary crossing of the corridor during <br />LoKen reviewcu d.„ n^ad bridees Mn/DOTs preference is that the temporary <br />the decision is 90% made to use the at-grade crossing at Watertown Road, <br />information. <br />Nancv Yoo of Mn/DOT Water Resources provided an overview regarding the stomwater draina^ <br />nlan for the corridor She indicated the plan continues to include a linear pond on the southern <br />^rUon of the WSI property. The plan also includes a pond south of the railroad tracks and we <br />Willow Drive. <br />Patti Loken reviewed options for a pedestrian access over the corridor from the Fleming Tra‘ <br />Addition to the Wolf property. <br />The list item on the agenda was a general review of the entire layout with an opportmity for the <br />2des“o express any coLms or identify any issues. Unfonunately, the representatives from the ci^ <br />oSg lL were not present for this portion of the meeting. The city of Orono representatives
The URL can be used to link to this page
Your browser does not support the video tag.