Laserfiche WebLink
r <br />APPENDIX E <br />ESTIMATED CONSTRUCTION COST FOR STORM SEWER IMPROVEMENTS <br />FERM)ALE ROAD SOUTH OF WAYZATA / PLYMOUTH BORDER <br />375 mm RCP STORM SEWER M 90.00 11 990 <br />450 mm RCP STORM SEWER M 110.00 400 44.000 <br />450 mm RCP F.E.S.EA 1000.00 1 1.000 <br />375 mm CMP CULVERT M 40.00 30 1.200 <br />STANDARD CATCHBASIN EA 1000.00 1 1.000 <br />STANDARD CATCHBASIN MANHOLE EA 1500.00 2 3.000 <br />STANDARD STORM SEWER MANHOLE EA 1500.00 1 1.500 <br />IMPROVED PIPE FOUNDATION M 3.00 411 1.233 <br />MECHANICAL TRENCH COMPACTION M 3.00 411 1.233 <br />ESTIMATED CONSTRUCTION COST <br />+5% CONTINGENCIES <br />+20% LEGAL, ENGINEERING AND ADMINISTRATION <br />TOTAL ESTIMATED COST <br />^55,156 <br />2.758 <br />$57,914 <br />11.583 <br />$69,497 <br />FERNDALE ROAD COST SUMMARY ORONO PLYMTH TOTAL <br />A. street IMph 6v EMENTS N. OF WAYZATA 432.709 432.709 ^65.418 <br />B. STREET IMPROVEMENTS S. OF N. WAYZATA BORDER 225.137 0 225.137 <br />C. TRAIL IMPROVEMENTS:0 77.742 77.742 <br />D. STORM IMPROVEMENTS N. OF WAYZATA 61.134 61.134 122.268 <br />E. STORM IMPROVEMENTS S. OF N. WAYZATA BORDER 69.497 0 69.497 <br />F. TOTAL ESTIMATED PROJECT COSTS 788.477 571.585 $1,360,062 <br />im'.h AAqumni~ftti iiiiw- J iift ■! rr i#\j ^