My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-06-1998 Council Packet Special Meeting
Orono
>
City Council
>
1998
>
01-06-1998 Council Packet Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 2:31:14 PM
Creation date
6/5/2024 2:30:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />APPENDIX E <br />ESTIMATED CONSTRUCTION COST FOR STORM SEWER IMPROVEMENTS <br />FERM)ALE ROAD SOUTH OF WAYZATA / PLYMOUTH BORDER <br />375 mm RCP STORM SEWER M 90.00 11 990 <br />450 mm RCP STORM SEWER M 110.00 400 44.000 <br />450 mm RCP F.E.S.EA 1000.00 1 1.000 <br />375 mm CMP CULVERT M 40.00 30 1.200 <br />STANDARD CATCHBASIN EA 1000.00 1 1.000 <br />STANDARD CATCHBASIN MANHOLE EA 1500.00 2 3.000 <br />STANDARD STORM SEWER MANHOLE EA 1500.00 1 1.500 <br />IMPROVED PIPE FOUNDATION M 3.00 411 1.233 <br />MECHANICAL TRENCH COMPACTION M 3.00 411 1.233 <br />ESTIMATED CONSTRUCTION COST <br />+5% CONTINGENCIES <br />+20% LEGAL, ENGINEERING AND ADMINISTRATION <br />TOTAL ESTIMATED COST <br />^55,156 <br />2.758 <br />$57,914 <br />11.583 <br />$69,497 <br />FERNDALE ROAD COST SUMMARY ORONO PLYMTH TOTAL <br />A. street IMph 6v EMENTS N. OF WAYZATA 432.709 432.709 ^65.418 <br />B. STREET IMPROVEMENTS S. OF N. WAYZATA BORDER 225.137 0 225.137 <br />C. TRAIL IMPROVEMENTS:0 77.742 77.742 <br />D. STORM IMPROVEMENTS N. OF WAYZATA 61.134 61.134 122.268 <br />E. STORM IMPROVEMENTS S. OF N. WAYZATA BORDER 69.497 0 69.497 <br />F. TOTAL ESTIMATED PROJECT COSTS 788.477 571.585 $1,360,062 <br />im'.h AAqumni~ftti iiiiw- J iift ■! rr i#\j ^
The URL can be used to link to this page
Your browser does not support the video tag.