My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-29-1998 Council Packet SPecial Meeting
Orono
>
City Council
>
1998
>
06-29-1998 Council Packet SPecial Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 2:26:31 PM
Creation date
6/5/2024 2:25:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />Sent By: Bonestroo & Associates;6126474179;Jun-24-98 2:11PM;Paqe 2/4 <br />mtegMMr <br />LiLeMl <br />Bonestroo <br />Rosene <br />AndefllcC <br />Assodacei <br />l4ArMIMII <br />Owner: City of Orono, P.O. Box 66, Crystal Bay, MN 55323-0066 Date June 24, 1998 <br />Contractor: G.L. Contracting. lnc„ 4300 Willow Drive, Medina, MN 55340 <br />Bond Co. <br />CHANGE ORDER NO. 1 <br />EDGEVVOOD HILLS/HERITAGE DRIVE SANITARY SEWT^R <br />File No. 139-98-099 <br />Description of Work <br />Contractor has agreed to construct the Heritage Drive Portion of the project only. This Change Order deletes <br />quantities for Edgewood Hills portion of the project <br />No.Item <br />Contract <br />Unit Quantity <br />Unit <br />Price <br />Total <br />Amount <br />Change Order No. 1 <br />Part 1 • Sanitary Sewer <br />6 Con.stnici manhole over existing sewer EA 1 24,666.60 24.666.60 <br />8 Std. MH 8’ dp.. 4' dia.. W/RI642B cstg.EA 3 1,552.40 4,657.20 <br />9 MH depth greater than 8' deep LF 29 124.60 3,613.40 <br />11 Directional bore 8" HDPE SDR 17 LF 790 47.50 37,525.00 <br />13 Directional bore 4" HDPE SDR 11 service pipe LF 1300 40.00 52,000.00 <br />15 4" PVC cleanout EA 10 95.20 952.00 <br />20 8" X 4” PVC or HDPE compatible service <br />wye branch EA 7 168.00 1,176.00 <br />21 Furnish 8 * x 4" PVC wye, cut into ex. 8" PVC EA 2 1,115.30 2,230.60 <br />22 4” PVC service pipe in place, SDR 26 LF 20 13.50 <br />270.00 <br />26 Insulation SY 20 13.70 274.00 <br />27 Sanitary sewer television inspection LF 790 1.10 869.00 <br />28 Traffic control LS 0.25 2,351.30 587.83 <br />Total Part 1 - Sanitary Sewer 128,821.63 <br />Part 2 - Restoration <br />33 Type 41A bituminous wearing course TN 200 30.50 6,100.00 <br />35 Bituminous material for tack coat GL 50 2.20 110.00 <br />36 Bituminous street patching SY 410 24.90 10,209.00 <br />37 Clearing and grubbing LS 0.1 13,224.00 1,322.40 <br />38 Bituminous driveway restoration SY 600 14.10 8,460.00 <br />43 Sod with 4” topsoil SY 5000 2.60 13,000.00 <br />44 Seed with topsoil, mulch and fertilUcr AC 0.1 4,408.00 440.80 <br />l:\139M SM9\CHANQEOR.WB2 <br />J
The URL can be used to link to this page
Your browser does not support the video tag.