My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-08-1998 Council Packet
Orono
>
City Council
>
1998
>
06-08-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 2:28:34 PM
Creation date
6/5/2024 2:19:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />15. <br />16. <br />17. <br />18. <br />19. <br />20. <br />21. <br />It is the expectation of the City and the developer that the Metropolitan Council <br />will approve incorporation of the property within the Metropolitan Urban Service <br />Area (MUSA) and allow the extension of sanitary sewer to serve the plat. In this <br />event, the developer shall construct said sewer to City standards, the design and <br />construction of said sewer shall be covered under the Developers Agreement, and the <br />Developer shall upon satisfactory completion of construction and acceptance by the <br />City, transfer ownership of said sewer facilities to the City, and shall grant to the City <br />appropriate easements over said facilities; and City shall henceforth maintain said <br />sewer lines. <br />All identified primary and alternate sewage system drainfield sites within the <br />subdivision shall be fenced off prior to any land alterations, and such fencing shall <br />remain in place until such time that each Lot is developed, or until such time that the <br />development has been provided with municipal sanitary sewer, whichever comes <br />first. <br />In the event that municipal sewer is not provided to the development, subdivider <br />shall submit complete and acceptable septic system designs for each lot prior to <br />the issuance of individual residence structure building permits. <br />Subdivider shall be responsible for installing a new conforming septic system to <br />serve existing residence on Lot 1 within 1 year of the date of final plat approval if <br />municipal sewer is not available, or shall abandon the existing nonconforming septic <br />system and connect to municipal sewer if sewer is available. <br />Applicant shall grant a sew'er connection easement over Lot 5 for the benefit of Lot <br />4, subject to approval of the City Engineer. <br />Prior to City release of the plat for filing, applicant shall provide evidence of fee <br />ownership of the property in a form acceptable to the City Attorney, and applicant <br />shall meet any other title requirements as may be required by the City Attorney. <br />Applicant shall provide all documents noted in this resolution in a format <br />acceptable to the City Attorney prior to release of the plat for filing. <br />Page 5 of 6 <br />, I
The URL can be used to link to this page
Your browser does not support the video tag.