My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-11-1998 Council Packet
Orono
>
City Council
>
1998
>
05-11-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 2:00:54 PM
Creation date
6/5/2024 1:58:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINNEHAHA CREEK WATERSHED DISTRICT <br />RULE B <br />STORMWATER MANAGEMENT & EROSION CONTROL PLANS <br />FOR INDmDUiVL LAND DEVELOPMENT PROJECTS <br />1. POLICY. It is the policy of the Board of Managers to: <br />(a) Require stormwater facilities to be oonritructedon individual sites included in land development <br />projects where practicable and effective. <br />(b) Manage stormwater and snowmelt runoff on a regional or sabv/atershed basis and promote <br />natural infiltration of-runofF throughout the Distnet to: <br />1) p rovid e promote effective water quality treatment ond where possible provide suoh <br />treatmen t. where feasible, prior to discharge to surface waterbodies and wetlands; and <br />2) so that future limit developed peak rates of runoff into major surface water bodies aro to <br />less than or equal to existing peak rates: and <br />3) promote infil'ration of both precipitation and runoff. <br />(c) Require preparation and implementation of erosion control plans for eenstruction and land <br />development activities, during the period of construction. <br />2. REGULATION. Except as provided in paragraph S herein, prior to commencine anv land altering <br />activities oenstruotion, a developer of land for residential, commercial, industrial, institutional, or public <br />roadway uses shall submit a stormwater management plan and an erosion control plan to the District in <br />conformit}' with the requirements of this rule and secure a permit from the District approving the stormwater <br />management plan and the erosion control plan. Except as provided herein. A a.stormwater management <br />plan and an erosion c ontrol plan are required for new development, redevelopment or additions to an <br />existing site. The managers will review a stormwa'er management plan and the erosion control plan only <br />after the applicant demonstrates that the project has received preliminary approval from the municipality <br />indicating compliance with existing municipal plans. (Please refer to the “Summary of Regulatory <br />Requirements” below.)
The URL can be used to link to this page
Your browser does not support the video tag.