Laserfiche WebLink
I 1' <br />(b) The water quantity requirements of this rule will be waived upon a determination by the Board <br />of Managers that a downstream facilit>(ies) is in place or has been ordered and the facility(ies) is <br />designed with adequate capacity to limit the peak runoff rate from the subwatershed under fully <br />developed conditions. The water quantity requirements of this rule may also be w aived upon a <br />determination by the Board of Managers that the time of concentration of the dow nstream receiving <br />water body is sufficiently long such that limiting the peak rate of runoff from the project has either <br />no practical effect or an adverse effect. <br />c) The water quality requirements of this rule will be waived upon a determination by the Board of <br />Managers that a downstream facility(ies) is in place or has been ordered and the facility(ies) is <br />designed to remove at least 50% of the total phosphorus from runoff entering the facility from the <br />subwatershed under fully developed conditions. <br />Draft • April 29, I99S