Laserfiche WebLink
r <br />f j <br />I I <br />MINUTES OF THE ORONO PLANNING CO\LMISSION <br />MEETING HELD ON JANUARY 20,1998 <br />bluff located on 3 of 4 lots forces the setback to an average 150', where normally the <br />setback is 75'. <br />Gaffron indicated the issues for discussion include access, lot area/width standards, on ­ <br />site sewage treatment, bluff impacts, tree preservation, park dedication, archaeological <br />sites, wetlands, and stormwater drainage. Gaffron said the code would generally limit <br />individual access to major roadways. A change will be necessary for access to Lot 8, <br />possibly by an outlot road. Hennepin County will also need to review access. Gaffron <br />said the best plan would be for all lots to access from one road, but with circumstances <br />being as they are, two roads would make sense. <br />Gaffron reported that the lots meet the 2 acre zoning. Lot 3 does not meet the 200 ’ width <br />requirement. The four lakeshore lots are narrow, and the angle of the existing property <br />boundaries with the shoreline makes it difficult to lay out the lots. The setbacks are 50 ’ <br />front, 30' side, 50' rear, and 75' setback from the bluff.