My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-1998 Council Packet
Orono
>
City Council
>
1998
>
03-09-1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2024 1:59:00 PM
Creation date
6/5/2024 1:53:10 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />P.O. Box 66 <br />Crystal Bay, MN 55323 <br />473-7357 <br />ZONING FILE #2339 <br />NOTICE OF PLANNING COMMISSION <br />ACTION <br />DATE OF NOTICE: February 26, 1998 <br />TO: James Render <br />9331 Yukon Ave. S. <br />Bloomington, MN 55438 <br />COPIES TO:Gale Putnam <br />1365 Tonkawa Rd. <br />Long Lake, MN 55356 <br />Mark Gronberg <br />482 Tamarack Ave. <br />Long Lake, MN 55356 <br />TYPE OF APPLICATION:Subdivision <br />DATE OF MEETING: 2/17/98 VOTE:5 FOR 0 AGAINST <br />Planning Commission recommends the following: <br />Approval subject to conditions noted below. <br />NOTES AND SPECIAL CONDITIONS: <br />1. Plat a 42' private road outlot along the length of the southerly property boundary <br />(assuming that the City has a legitimate 8' road easement over the adjacent property). <br />2.Build a 28' paved width private road from Tonkawa Road to approximately the mid <br />point of Lot 1, with a'T emergency vehicle turnaround as proposed in revised plan <br />(attached). <br />3.Lots 1, 2 and 3 should be credited with 17' of the road outlot area for hardcover <br />calculation purposes, based on the fact that applicant is providing 17' more than half <br />of a 50' road corridor that will sen'e the entire neighborhood. <br />4.Subject to items #5,6, 7 of February 13,1998 staff memo; <br />5. The applicant should address all grading and drainage issues, and <br />develop a plan for a water quality pond on the site per the Engineer's <br />recommendation (This is required before Council can grant formal <br />preliminary plat approval). <br />6. The standard park dedication fee should be required. <br />7. The standard drainage and utility easements should be required. <br />5.Applicant's next scheduled meeting is confirmed as; <br />City Council Monday, March 9, 1998, meeting starts at 7;00 p.m. <br />/I <br />If you desire certified copies of the official Planning Commission minutes, they are available from <br />the City Recorder after review and approval by the Planning Commission. <br />X:\APPS\WPWIN60\WPIXKS\CAROI.BPC ACTI()N\233'^ <br />-ia» w. ^ -
The URL can be used to link to this page
Your browser does not support the video tag.