Laserfiche WebLink
4 <br />MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON JAIWARY 20, 1998 <br />■ 1 <br />(#18 - #2327 Orono B^elopment - Continued) <br />Gaflfron said he would recohimend that limitjli^ be placed on the use as a separate line. <br />The limitations would need He has been given some suggestions from <br />Shardlow, which is currently not^lK^d in the proposed language. Lindquist and Smith <br />said they would like to revie^lW^an^j^ge when drafted. Schroeder felt satisfied with <br />staff handling the matter^idndquist a^^^to let staff develop the details and send it <br />forward to the Counpil^r review. <br />Vote: Ayes>»fNays 1, Hawn. <br />CoqjiW will review the application at their February 2?yeeting. <br />Commercial Site Plan Review and Variances <br />(#19) #2326 ORONO DEVELOPMENT, LLC, 2380 SHADYWOOD ROAD - <br />Variances for hardcover and front yard parking setback and a commercial site plan <br />review to construct an 11,000 sq. ft. retail/service center building - 12:03-1:00 a.m. <br />The Certificate of Mailing and Affidavit of Publication were noted. <br />The Applicants were present. <br />Gaffron reported that the application is a commercial site plan review and variance <br />approval for the multi-retail building noted in agenda item #18. Variances include 500- <br />1000' zone hardcover and parking setback from street. The property is 1.86 acre site. <br />Gaffron noted the property as it exists today and with proposed improvements for a bank <br />building and retail sales. A portion of Navarre Lane was vacated last year. The site <br />contains stormwater management ponding serving the Culver site. <br />Gaffron reviewed the application with regards to conformity with performance standards <br />of the B-5 District as laid out in the information packet. He noted that the building layout <br />is similar to what has previously been shown. Gaffron reported that the hardcover is less <br />than what is seen elsewhere in Navarre. There will be building space for 6-8 tenants. <br />Inside floor plans are not yet available. The permitted and conditional uses are in <br />conformance as are lot eirea and lot width. The front yard setback requirement is 20* <br />minimum and proposed at 5'. The landscape architect has commented that more space <br />should be provided for plantings. A 20' rear setback is required for the through lot but <br />proposed at 14'. Entrance monuments are also being proposed.