Laserfiche WebLink
jji. <br />m <br />Highway 12 Study <br />February 21» 1991 <br />Page 2 of 3 <br />Members will be able to amend or add others at your work <br />session on February 27th. <br />Work Sheet for Discussion of Issues: <br />1. Location of highway? <br />2. Depending on locationr type of road to be installed; <br />A) lanes • number <br />B) through congested area of Long Lake: <br />Options: <br />1. Controlled lanes (3 lane highway, 2 lanes used <br />during peak hours, one way) <br />2. West lane one way going west on existing <br />corridor and a separate corridor installed south <br />of Burlington railroad for one way east traffic. <br />3. Elevated or depressed roadway. <br />3. Access points: <br />A) limited access, access at each existing crossroad, <br />B) elevated or grade. <br />4. If upgrade of existing Highway 12 corridor is proposed, <br />what methods or means shall be employed by the City of Orono <br />to minimize impact on incorporated City of Long Lake? <br />A) Immediate or future consolidation. <br />B) *Oe~annexation” of lands to Long Lake to compensate <br />for loss of lands. <br />C) Monitary payments to offset tax base loses. <br />D) Others. <br />5. Recommendation for upgrade of other east/west arteries to <br />cover future needs based on traffic forecasts (not available <br />for these considerations): <br />A) <br />B) <br />C) <br />D) <br />B) <br />Highway 55 - State <br />County Road 6 - County <br />County Road II * County <br />County Road 24 - County <br />Others.