My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-25-1991 Council Packet
Orono
>
City Council
>
1991
>
02-25-1991 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 10:16:38 AM
Creation date
5/21/2024 10:13:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r: <br />I <br />-l <br />IV <br />r <br />f-L- <br />hV <br />r1^-il. <br />i.i- <br />h <br />¥■ <br />&I <br />eF,‘ <br />k <br />rk <br />completed. Once fenced in 'ne City would then have <br />the cuccent lumber shed removed. <br />D. Interim Repair of Lumber Shed - Staff explored <br />to ”iei Tf~ certain structural reinforcements could <br />be done to the existing facility to lessen the <br />potential for implosion. As noted in Attachment F, <br />the feasibility is non-existent even if certain <br />repairs could be done, the code (Building or <br />Zo. ing) dones not allow a dirt floor for a <br />commercial building. <br />E. Undertake a New Facility - Should the City <br />select a site Tor Public Works and determine its <br />financing approach it could immediately go to <br />construct a building for Public Works and once <br />completed move into that from what ever option was <br />selected for interim storage. <br />F. Construction of a temporary - The staff is <br />attempting to obtaTn an estimate for a temporary <br />structure for a 1-2 year period. It is hoped this <br />would be ready for the 2/2S meeting. <br />4. Combination Issue »4 Redesign for Crystal Bay <br />NeIgKborhood”^"^ThFs issue was discussed at the meeting <br />on the 2dtfi and issues related to that to come up with <br />an alternate design include as noted in Attachment E. <br />S i ze <br />Shape <br />Quality and texture of building materials <br />Roof line <br />Number of levels <br />In discussions with Boarman he would be willing to <br />do additional schmetics for this site based on <br />discussions by Councilmembers as to what kind of <br />things they found objectionable with "standard <br />design" for this neighborhood for about $3,000. <br />5. Workshop Meeting Date and Purpose - This is addressed <br />in Attachment A together with the issues of note at that <br />meeting would be: <br />Site <br />Size of facility <br />Cost and financing <br />Roles for Planning Commi«)«M.v7 and Citizen Committee <br />Additionally related to that would be level of <br />participation Council would desire from Planning <br />Commission and citizens Committee in that workshop. <br />ALTERNATIVES - <br />it.,-
The URL can be used to link to this page
Your browser does not support the video tag.