My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-25-1991 Council Packet
Orono
>
City Council
>
1991
>
02-25-1991 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 10:16:38 AM
Creation date
5/21/2024 10:13:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DISCUSSION - <br />1. Common versus split site - Attachment B is a draft <br />summary of the issues related to the site, both ones <br />that are quantifiable together related issues in the <br />areas organizational development, location and <br />compatibility of land uses. It is requested that <br />Council indicate other issues they may think are <br />relevant or questions as to information presented. Jack <br />Boarman is reviewing the draft. <br />2. Neighborhood questionaire - A questionalre is being <br />draft for Council review. The questionaire will attempt <br />to give background and alternatives that would be <br />helpful to the neighborhood in making an informed <br />decision. If Council desires to undertake alternative <br />design for the Crystal Bay site, such designs would be <br />most helpful to give a perspective on how the building <br />would fit. <br />Storage of Pub lie Works equipment - As mentioned at <br />the January~?8th meeting, staff nas been exploring what <br />to do with the current ’'Lumber Shed” and the equipment <br />stored therein. Staff feels that the building may be on <br />the verge of "implosion ” on its own and has been <br />researching options related to that. These options are <br />as follows: <br />A. Status Quo - Continue with the utilization of <br />the current structure but continue to close off <br />areas that are unsafe. <br />U:' <br />B. Renting of Alternative Space - Staff has been <br />working over the last 2 months to determine what <br />space may be available of at least 15,225 square <br />footage and the only rental square footage of <br />significance in the area is in Tonka Bay, near the <br />NSP facility. It is estimated that to rent the <br />sole building there, which would be storage but <br />large enough to allow the operation to work out of <br />that facility on an interim basis, would be about <br />$50,000 a year plus utilities. This facility <br />however, would not equate to the longterm needs and <br />would result in much jockeying of equipment and <br />outdoor storage to make usable together with <br />lacking many of the offices and shops that are felt <br />needed on a longterm basis for the City. <br />C. Tear Down Existing Facility, Undertake Outdoor <br />Storage of Current Indoor Storage Materials - Under <br />this optTon the City would fence in the parking lot <br />next to the lumber shed area, together with <br />utilizing the fenced in area under the Navarre <br />water tower for storage of trucks and other <br />equipment outside until a new facility was
The URL can be used to link to this page
Your browser does not support the video tag.