My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1991 Council Packet
Orono
>
City Council
>
1991
>
02-11-1991 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 11:12:41 AM
Creation date
5/20/2024 11:07:13 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
603
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br />K' <br />i!' <br />r <br />^fr <br />- <br />ORONO PLANNING COMMISSION MEETING NOVEMBER 19, 1990 <br />ZONING FILE #1600-RICK'S SUPER VALO CONTINUED <br />building is 14' nign. That is a very steep slope coming from a <br />very high retaining wall. The retention pond is deceptive <br />because it is really very shallow. The building elevations is an <br />important element that we are currently lacking." <br />Mabusth concurred that the proximity of the retaining wall <br />to Kelly Avenue may pose a problem not only from a drainage <br />aspect, "but also from a safety standpoint. <br />Mr. Bruce Kelley stated that there would ba a railing <br />completely around the retaining wall. <br />Bellows stated that she did not think such a proposal would <br />be aesthetically pleasing to the residents living in that area. <br />She said, "I am also concerned that we are being asked to approve <br />intensification of this building in the one corner that is facing <br />and nearest to residential property." <br />Mr. Bruce Kelley stated that screening is proposed for that <br />■f.. <br />fi' <br />- <br />-fc:, <br />ik: i. if V t <br />Bellows said, "I would need to see what is proposed. I am <br />having a difficult time imagining how screening can occur wit.hout <br />the benefit of terracing." <br />Chairman Kelley asked wny it would not be possible to <br />construct a retention pond with more deptn. <br />Mr. Bruce Kelley replied, "That is a possibility. There is <br />a City water main running through that location which may <br />restrict the depth." <br />Chairman Kelley said, "The City ordinances require that <br />drainage from a property be handled by that property. Because of <br />the great amount of blacktop on this property, that is not being <br />done. I believe that the proposed retention pond should be <br />constructed to more effectively handle runoff currently coming <br />from the property, not just that coming from the addition." <br />Bellows stated that three-quarters of the retention area <br />could be deepened without interfering with t.he City's water line. <br />Mabusth asked the Planning Commission to consider whether <br />they would recommend approval of expanding the receiving dock on <br />the southeast corner of the store. <br />Chairman Kelley replied, "I would feel more comfortable with <br />the southeast corner of the store because the bank is located on <br />that side." <br />Mabusth noted that there are steep elevations on that side <br />- 5 -
The URL can be used to link to this page
Your browser does not support the video tag.