My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-28-1991 Council Packet
Orono
>
City Council
>
1991
>
01-28-1991 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2024 2:28:36 PM
Creation date
5/13/2024 2:26:15 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Q: <br />A: <br />tr Q: <br />ri A: <br />Q: <br />1 <br />A; <br />■-'t. <br />Q: <br />A: <br />n <br />",-r Q: <br />A: <br />;r' <br />ii <br />k-Q: <br />; »•A; <br />■t- <br />Q:; r ; <br />f - <br />i <br />1.A: <br />Q: <br />\ <br />A: <br />1 Q:t:A: <br />Citizen ’s Committee Minutes <br />November 13. 199(‘ <br />Page 3 <br />What is the procedure for acquiring property? <br />An appraiser is hired by Mn/DOT, and fair market value is assigned for the <br />property. Mn/DOT also reimburses for personal appraisals. The State makes an <br />offer for acceptance. If rejected, the process of eminent domain begins, which will <br />open litigation. <br />When does property acquisition begin? <br />Two to three years before construction. <br />What consideration is made for residential sound indemnity? <br />Sound/noise mitigation is documented in the EIS for each alternative. Mitigation <br />will be implemented for homes with noise exceeding state standards (if cost- <br />effective). <br />Who makes the decision between a complete properly acquisition or a noise wall? <br />No unnecessary property will be acquired. A person can, however, file reverse <br />oondemnaiion if they do not wish to live in their current residence as a result of the <br />roadway. <br />When do controls on planned development go into effect? <br />The State has no control over plaimcd development within the path of any of the <br />alternatives. This is the reason that it is important tu concur on a preferred <br />alternative, so the corridor can be preserved by the municipalities for the roadway. <br />What happens to undesign..ted wetlands? <br />All wetlands are protected, but those that are taken must be replaced (mitigated). <br />Has anyone considered an alter.*»advc that continues directly west of existing TH 12 <br />on CR 30 in Delano, then follows straight north back to existing TH 12? <br />Should discuss with committee representatives as a "shift” of alignment. <br />If a buyout is imminent, how soon would funds be available for a person to find <br />another home? <br />Two to three years before construction. Federal guidelines are very explicit <br />regarding relocation requirements. <br />What value is placed on the cost of a corridor, as a factor in determining which one <br />is selected? <br />A political consensus is probably the most important factor in determining the <br />selected route. <br />'.Mrm-
The URL can be used to link to this page
Your browser does not support the video tag.