My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-28-1991 Council Packet
Orono
>
City Council
>
1991
>
01-28-1991 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2024 2:28:36 PM
Creation date
5/13/2024 2:26:15 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />A <br />I'-- <br />F <br />if" <br />rv <br />(I t- <br />pT: <br />S5-;.' <br />Johnson then asked for an update on the City/State Goals. Project Issues/Concerns paper. <br />Dallam distributed the revised paper which incorporates a (supplemental) new Goal 5 for <br />Lx)ng Lake, as introduced at the September 26 Policy Committee meeting and recommended <br />by the Technical Committee at their October 16 meeting. In response to a question from <br />Johnson. Dallam explained that changes in this paper can be recommended by other <br />committees or the general public, but that the Policy Committee would have the <br />responsibility of approving them. The Policy Committee approved the addition of new Goal <br />#5 for Long Lake (see 10-18*90 paper update). <br />A discussion on the possible alternative highway corridors as identified on the base map <br />board was then led by Dallam. They were presented as follows: <br />L No build - (not shown, assumes only minor modifications to the existing roadway) <br />2. Upgrade existing T.H. 12 on the mainline (red line) - to carry' local and through <br />trafGc <br />3.T.H. 55 Bypass (northernmost blue line) - to remove outsiate through traffic from <br />T.H. 12 <br />4.C.R. 11 Bypass - new northern alignment between T.H. 55 and T.H. 12 (blue line - <br />suggested by HNTB) • to remove outstate through traffic from T.H. 12 <br />5.C.R. 6 Bypass • new alignment paralleling C.R. 6 north of Long Lake (blue line) • <br />to remove outstate and Study Area through traffic from T.H. 12 in Long Lake. <br />6.South Bypass - new alignment bypassing Long Lake. Maple Plain, and Delano (blue <br />line) - to carry outstate and Study Area through traffic <br />Dallam added that the orange lines represent possible connectors to combine/modify <br />alternatives. The green line represents the old Mn/DOT study bypass of Long Lake, which <br />the Citizen’s Committee had asked to identify. . <br />The Committee then discussed the availability of current traffic data (1988) and that <br />forecasts will probably be available in November. <br />Johnson then asked for conunents on the alternatives from the Committee. Grabek and <br />Hay asked if small copies of the alternative corridors could be made available. Dallam <br />agreed to provide these copies, and said that the Committees would also be receiving full- <br />size prints of the corridors for further study. <br />Wetter mentioned that there is some local confusion that the current Highway 12 <br />improvement program is not the same as the Corridor Study. Humbert added that several <br />localized, minor improvement projects west of Long Lake are programmed for construction.
The URL can be used to link to this page
Your browser does not support the video tag.