My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-13-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
05-13-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2024 10:28:20 AM
Creation date
5/10/2024 12:39:46 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br /> <br />NO. 7477 <br /> <br /> <br />3 <br /> <br /> <br />B3. Designed by a registered engineer or landscape architect, depending on project <br />scope; the Owners have provided an updated certificate of survey and engineered <br />wall construction plan from a registered engineer and/or surveyor supporting the need <br />for the currently proposed number and location of replacement walls. This criterion <br />has been met; and <br /> <br />B4. Designed to be the minimum size necessary to control the erosion problem. The <br />Owners have provided a plan and statement from a licensed professional supporting <br />the proposed landscaping and replacement wall solution. This criterion has been met. <br /> <br />In addition, Municipal Code Section 78-196 provides a list of conditions supporting CUP <br />issuance. The City Council may grant a CUP as applied for or in modified form. Based on the <br />application and the evidence submitted, the Council must find that the proposed use at the <br />proposed location is or will be: <br /> <br />B5. Consistent with the community management plan; the new walls and landscape plan will <br />help to preserve the lake slope. Protection and preservation of the natural lake shoreline <br />is an identified priority of the Comprehensive Plan. This criterion has been met. <br /> <br />B6. Compliant with the zoning code, including any conditions imposed on specific uses as <br />required by article V, division 3 of the City Code; retaining walls within the lakeyard are <br />permitted where they are deemed necessary to protect the integrity of the slope. The <br />Owners’ engineer provided a statement indicating the need for the proposed walls and <br />plantings. This criterion has been met. <br /> <br />B7. Adequately served by police, fire, roads, and stormwater management; the property <br />meets this standard. <br /> <br />B8. Provided with an adequate water supply and sewage disposal system; the property <br />meets this standard. <br /> <br />B9. Not expected to generate excessive demand for public services at public cost; the <br />retaining wall project should not generate an excessive demand for public services at a <br />public cost. This criterion has been met. <br /> <br />B10. Compatible with the surrounding area as the area is used both presently and as it is <br />planned to be used in the future; the installation of replacement stone retaining walls <br />98
The URL can be used to link to this page
Your browser does not support the video tag.