Laserfiche WebLink
Fee Escrow Notes <br />Valuation based on ICC 2012 Building Valuation <br />tables <br />Total Valuation Fee <br />$1.00 to $500 <br />$501.00 to $2,000.00 <br />$2,001.00 to $25,000.00 <br />$25,001.00 to $50,000.00 <br />$50,001.00 to $100,000.00 <br />$100,001.00 to $500,000.00 <br />$500,001.00 to $1,000,000.00 <br />$1,000,001.00 and up <br />State Surcharge as required by State <br />Demolition <br />Demolition: Principal structure $100.00 <br />Demolition: Accessory structure/Septic system <br />(Per unit fee)$50.00 <br />Retaining walls Based on Value Table <br /> May require City Council approval (Variance or <br />CUP) <br />City Engineer may require an erosion control <br />escrow for projects disturbing soils. <br />Not to Exceed <br />$1,000.00 <br />Plumbing 1.25% of project value, <br />based on valuation table n/a <br />Backflow registration $10.00 <br />Plumbing minimum $26.25 <br />$6,254.92 for the first $1,000,000.00 plus $4.20 for each additional $1,000.00, or fraction thereof <br />$715.92 for the first $50,000.00 plus $7.88 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 <br />$1109.92 for the first $100,000.00 plus $6.30 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 <br />$3,629.92 for the first $500,000.00 plus $5.25 for each additional $1,000.00, or fraction thereof, to and including <br />$1,000,000.00 <br />$26.25 for the first $500.00 plus $3.41 for each additional $100.00, or fraction thereof, to and including $2,000.00 <br />$77.40 for the first $2,000.00 plus $15.49 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 <br />$433.67 for the first $25,000.00 plus $11.29 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 <br />$26.25 <br />38