My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-13-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
05-13-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2024 10:28:20 AM
Creation date
5/10/2024 12:39:46 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fee Escrow Notes <br />Tent/ Canopy Permits $55.00 <br />*City Administrator may require an erosion <br />control escrow for projects disturbing soils or tree <br />replacement. <br />$1,000.00 Variable depending on project scope, but not to <br />exceed <br />Zoning confirmation letter $55.00 Request for zoning confirmation letter <br />Address Change Request by Owner $55.00 <br />BUILDING CODE ADMINISTRATION: <br />Building Permits Based on Value Table <br />Building permit fees (Building, Plumbing, <br />Mechanical, unless otherwise noted) Based on 2012 Building <br />Valuation Table <br />Plan Review Fee 65% of Building Permit Fee <br />Rereview Plan Fee Up to the cost of the Plan <br />Review Fee Based on <br />Building Offical <br />Recommendation <br />Minimum Fee $26.25 <br />Moved-In Structure (not including foundation, <br />interior remodel, etc.)$275.00 <br />Pre-Move Inspection $165.00 <br />Special investigation fee (work started without <br />obtaining a permit – applies even if no permit is <br />pulled) <br />100% of Building permit fee <br />Manufactured Home Installation $275.00 plus <br />State Surcharge and requires a regular building <br />permit if also doing basement, foundation, garage <br />or entryway, fees are based on sq. ft. State Table $275.00 <br />City Administrator may require an erosion control <br />escrow for projects disturbing soils.$1,000.00 <br /> Refunds: 80% of building permit fees on projects not yet started (within 90 <br />days of permit issuance by municipality). No refund on plan review fees, state <br />surcharge or maintenance permits <br />37
The URL can be used to link to this page
Your browser does not support the video tag.